Caistor Canal

Caistor Canal

Water flowing over the weir and through the derelict chamber of Moor lock. The stonework is still in remarkably good condition.
Specifications
Locks 6
Status Derelict but largely extant
History
Original owner Caistor Canal Navigation Company
Principal engineer Robert Dickenson
Date of act 1793
Date of first use 1800
Date closed 1855
Geography
Start point Moortown
End point River Ancholme

Caistor Canal

Legend
River Ancholme
River Ancholme towpath bridge
Beck End lock
Ings lock
Willow lock
Brigg Road, South Kelsey
South Kelsey basin
Mill lock
Moor lock

B1205 and Jervis Bridge
infilled section
Moortown lock
Moortown wharf
B1434 Bridge, Moortown
Nettleton Beck

The Caistor Canal was a 4-mile (6.4 km) canal in Lincolnshire, England, constructed between 1793 and 1798. It fell into disuse sometime after 1850 and was legally abandoned in 1936. It ran from the River Ancholme, near South Kelsey toward Caistor through six locks, terminating at Moortown, 3.5 miles (5.6 km) away from its intended terminus at Caistor.[1] Parts of it were dredged in 2010, to aid flood defences in South Kelsey.

History

Water transport in the vale of the River Ancholme was improved as a result of work carried out between 1767 and 1769. The Caistor Canal was conceived in July 1792 as a feeder to the river, enabling boats to reach the market town of Caistor, some 8 miles (13 km) to the east. An initial meeting was called by a Mr Hall on 3 July 1792, at which it was decided to ask the canal engineer William Jessop to prepare a survey of the route. His plans were considered by the Ancholme Navigation Commissioners, in order to assess the risks of flooding caused by such a proposal.[2] As they did not oppose the plans, the canal was authorised by an Act of Parliament passed on 3 June 1793, which created the Caistor Canal Navigation Company, with powers to raise £15,000 in £100 shares to construct the canal, and an additional £10,000 if required.[3]

Traffic consisted of coal inward, agricultural produce leaving the area, and general goods. There were six locks, which lowered the level of the canal by 42 feet (13 m). The Act authorised the building of the canal to Caistor, and a lane was constructed from the town to the site of the proposed basin, but the construction stopped at Moortown, some 3.5 miles (5.6 km) to the west. It is likely that financial problems were the reason for this, as the company borrowed £4,600 from Francis Foljambe, one of the principal promoters of the canal and the major landowner on its route. Income from the tolls was not sufficient even to pay the interest, for there were £574 of arrears on the loan by 1813.[2]

Soon after it opened, there were proposals to extend the canal to Market Rasen, but no further action was taken.[2] The canal appears to have become disused in the 1850s, a few years after the opening of the Market Rasen branch of the Manchester, Sheffield, and Lincolnshire Railway, which came nearer to Caistor than the canal. However some traffic may have continued to South Kelsey, the village at its midpoint, until later in the century. The South Kesley estate was sold by Mr. Foljombe a few years after the canal opened. The new owner, Mr. Skipworth, and his descendents, were resident owners throughout the nineteenth century. Although the canal company continued to legally exist the canal appears latterly to have been managed as if part of the Skipworth estate, but the nature of the legal arrangement for this, if any, is not recorded. Following the cessation of traffic sometime in the latter half of the nineteenth century, parts of the canal were converted to other use: the fourth lock up was used as the site for a watermill - with the wheel occupying the lock chamber. The canal became dry above the fifth lock and the stonework of the sixth lock removed entirely before 1883. At some date after all traffic had ceased weirs were built across the locks below South Kelsey. Following the sale of the estate by the Skipworth family in the early years of the twentieth century the canal and its associated drainage system fell entirely out of repair. In order to restore proper drainage to the surrounding land, the canal was taken over by the Ancholme drainage authority in 1936, after a formal abandonment order (Caistor Canal Act Revocation Order) had been obtained for the navigation under the 1930 Land Drainage Act.

The canal was a broad canal, built to take boats of similar size to the Sheffield canal.

Today

Parts of the channel were dredged in 2010 to improve flood defences.

The canal is no longer navigable, and is maintained by the Environment Agency as a main drainage channel. The remains of the lower five lock chambers and the abutments of the tow-path bridge where the River Ancholme towpath crossed the canal are now grade II listed structures.[4] Despite being closed, two narrowboats successfully reached the first lock in 2002.[5]

As a response to the flooding of homes in South Kelsey during the summer of 2007, the Environment Agency dredged part of the canal to return it to its original depth in March 2010. Around 1 mile (1.6 km) of the bed, between the locks either side of South Kelsey village, was affected by the work, which increases the capacity of the watercourse and reduces the risk of future flooding. The channel had been impeded by several sand bars that had developed, and these were removed as part of the project. Environmental consultants assisted with the work, to ensure that the resident population of water voles were not harmed by the operation.[6]

Route

See also

Bibliography

References

This article is issued from Wikipedia - version of the 6/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.