Danycoed Halt railway station

Coordinates: 51°54′27″N 4°19′55″W / 51.90750°N 4.33194°W / 51.90750; -4.33194

Pannier tank no.6430 waits at Danycoed Halt on the Gwili Steam Railway

Danycoed Halt, which is Welsh for below the trees, was built by the Gwili Railway in the late 1990s and opened in 2001. It is the current northern terminus of the line, but may become redundant when the preserved railway extends over a mile northwards into the nearby Conwyl station site and then further on up to Llanpumpsaint Station some 2½ miles further on.

The halt (along with a nearby "Llwyfan Cerrig" station) did not exist in British Railways days and currently features a four-coach platform, a typical GWR storage hut and other station furniture such as lamp posts and benches. The track layout consists of a simple "run-round" loop (designed to allow the locomotive to run around and couple up to the carriages for the return journey) with a pair of points controlled by a "single throw" lever at the northern end, and a pair controlled by a two-lever ground frame locked by a key on the train staff at the southern end.

Just beyond the north end of the platform, a wrought iron girder bridge crosses the River Gwili. The bridge requires repair and thus inhibits immediate progress into the site of "Conwyl Elfed" station, (Just three bridges across the River Gwili).

Preceding station   Heritage railways Following station
Conwyl
proposed
  Gwili Railway   Llwyfan Cerrig
This article is issued from Wikipedia - version of the 11/2/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.