Fives-Hirson Railway

Fives-Hirson Railway
Overview
Status Open
Locale France (Nord-Pas-de-Calais)
Termini Somain
Hirson
Operation
Opened 1869 - present
Owner SNCF (1938–present)
Technical
Line length 123 km (76 mi)
Number of tracks Double track
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Fives-Hirson railway is a double tracked electrified railway line linking Lille-Flandres with Hirson.

History

The line opened in stages:[1]

Infrastructure

Electrification was complete by 1958. The line uses automatic block signalling (BAL, Bloc Automatique Lumineux).

References

This article is issued from Wikipedia - version of the 6/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.