HVDC SylWin1
HVDC SylWin1 is a high voltage direct current (HVDC) link under construction to transmit Offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters with DC ratings of 864 MW, ±320 kV are used and the total cable length is 205 km. The project is similar to the HVDC BorWin2 project but has slightly higher power and voltage ratings. It is being built by the Siemens/ Prysmian consortium and was handed over to its owner, TenneT, in April 2015.[1]
See also
- High-voltage direct current
- Offshore wind power
- HVDC BorWin1
- HVDC BorWin2
- HVDC BorWin3
- HVDC DolWin1
- HVDC DolWin2
- HVDC DolWin3
- HVDC HelWin1
- HVDC HelWin2
References
- ↑ TenneT Takes Over SylWin1 Offshore Grid Connection, Offshore Wind.biz, 27 April 2015.
External links
- Description of project on TenneT website (in German).
- Factsheet – SylWin1 HVDC Platform
- SylWin1 HVDC System, CIGRÉ Compendium of all HVDC Projects.
This article is issued from Wikipedia - version of the 9/17/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.