MRT Brown Line
MRT Brown Line รถไฟฟ้าโมโนเรล สายสีน้ำตาล | |
---|---|
Overview | |
Type | Straddle-beam monorail |
System | MRT |
Status | planned |
Locale | Bangkok and Nonthaburi, Thailand |
Termini |
Nonthaburi Civic Center Sammakon |
Stations | 21 |
Operation | |
Opened | 2021 |
Owner | Mass Rapid Transit Authority of Thailand |
Character | Elevated and underground |
Rolling stock | N/A |
Technical | |
Line length | 22 kilometers (14 mi) (est.) |
Number of tracks | 2 monorail tracks |
Electrification | Third rail |
Operating speed | 80 km/h (50 mph) |
The MRT Brown Line is a 22 km rapid transit line under preliminary study in Bangkok, Thailand. The line is proposed to run from Khae Rai, Nonthaburi to Bueng Kum, Minburi with 21 stations as a monorail.
The line was proposed as the Gold Line by the Pheu Thai party for the Bangkok Governors election held in March 2013. This was in response to objections by Kasetsart University to long-proposed Expressway extensions. The line is an alternative to an elevated Expressway.[1] However, the Pheu Thai candidate did not win the election and the Gold Line was dropped. The Deputy Minister of Transport stated that land appropriation costs were too high.[2] Subsequently, OTP reworked the Gold Line proposal into a new Brown Line following a comparable route. As of June 2013 the route was under preliminary study by OTP.[3]
This line is not the original 2004 13 km proposal from Bangkapi to Min Buri. This was subsequently merged in 2009 into an extended MRT Orange Line.
Route
The Brown Line was to start at Nonthaburi Civic Center and continue to Khae Rai and along Ngam Wong Wan road to Vihavadi-Rangsit road (interchange with SRT Dark Red Line) and continue east to Kaset. The Civic Center line would interchange with MRT Purple Line & MRT Pink Lines. Kaset would interchange with BTS Sukhumvit Line.
The line heads east along Prasote Manukit road (AKA Kaset-Namawin rd) past Chalong Rat Expressway (interchanging with the proposed Grey Line) to Namawin Rd. It continues south along Namawin Road and cuts through directly southeast from Namawin soi 30 junction to Seri Thai rd soi 35 junction. The line extends further southeast where it terminates at Ramkhamhaeng rd (soi 129/1 junction) to interchange with MRT Orange Line.
Progress
In August 2013, the MRTA approved the line in principle with a goal to complete design by 2016, followed by a 3-year construction period and a 2021 opening.[4]
Stations
The 22 km Brown line will have 21 stations (plus 2 potential future stations):
- Nonthaburi Government Complex.
- Khae Rai.
- Ngamwongwan Soi 12.
- Prachachuen
- Shinakhet
- Klong Prem.
- Bangkhet. (Interchange with SRT Dark Red Line)
- Kasetsart.
- Bank of Agriculture (Interchange with future Dark Green BTS ext).
- Bang Bua.
- Lad Plakhao.
- Prasoed Manookij Soi 18.
- Sukhonthasawat.
- Kaset - Nawamin (Interchange with proposed BMA Grey Line).
- Klong Lamjiak.
- Nuan Chan 11.
- Nawamin.
- Nawamin Soi 50.
- Bueng Kum.
- Serithai.
- Summakorn. (Interchange with proposed MRTA Orange Line)
Note: Station names are provisional.
Future Stations:
- Prasoed Manookij Soi 25 between Stations 11 & 12
- Nawamin Soi 42 between Stations 18 & 19.
References
- ↑ http://www.bangkokpost.com/news/transport/335419/kasetsart-backs-light-rail-move
- ↑ http://www.bangkokpost.com/news/transport/349823/city-expressway-plan-redrawn-to-go-north
- ↑ MRT Brown Line on Facebook
- ↑ "MRTA endorses Brown Line (Khae Rai-Lam Salee)". The Nation. Bangkok. 21 August 2013. Retrieved 6 November 2013.
External links
- "2Bangkok Brown Line thread" Semi-regular updates, articles, pictures and commentary (In English)
- "Airport Rail Link, BTS, MRT & BRT network map"
See also
- BTS Skytrain
- Airport Rail Link (Bangkok)
- Bangkok Metro
- MRT Blue Line
- MRT Grey Line
- MRT Orange Line
- MRT Pink Line
- MRT Purple Line
- MRT Yellow Line
- SRT Red Lines
- Bangkok BRT