Mianus River Bridge

Not to be confused with Mianus River Railroad Bridge.
Mianus River Bridge

Mianus river bridge in 1977. The collapse happened in the eastern-most southern section (visible right)
Coordinates 41°02′12″N 73°35′31″W / 41.03667°N 73.59194°W / 41.03667; -73.59194Coordinates: 41°02′12″N 73°35′31″W / 41.03667°N 73.59194°W / 41.03667; -73.59194
Carries Six lanes of I-95 / Conn. Turnpike
Crosses Mianus River
Locale Cos Cob neighborhood of Greenwich, Connecticut
Official name Michael L. Morano Bridge
Maintained by Connecticut Department of Transportation
Characteristics
Design Girder and floorbeam
Clearance below 70 feet (21 m)
History
Construction begin 1986
Opened 1958, 1992
Collapsed 1983
Mianus River Bridge
Location in Connecticut
Mianus River Bridge
Location in Connecticut

The Mianus River Bridge carries Interstate 95 over the Mianus River in the Cos Cob section of Greenwich, Connecticut. The bridge suffered a 1983 collapse, killing several motorists. The replacement span is officially named the Michael L. Morano Bridge, after a state senator who represented Greenwich.

Collapse

The bridge had a 100-foot (30.5 m) section of its deck of its northbound span collapse on June 28, 1983. Three people were killed when two cars and two tractor-trailers [1] fell with the bridge into the Mianus River 70 feet (21.3 m) below; three were seriously injured.[2]

Casualties from the collapse were few because the disaster occurred at 1:30 a.m., when traffic was low on the often-crowded highway.[3]

Causes

The collapse was caused by the failure of two pin and hanger assemblies that held the deck in place on the outer side of the bridge. Rust formed within the bearing of the pin, exerting a force on the hanger which was beyond design limits for the retaining clamps. It forced the hanger on the inside part of the expansion joint at the southeast corner off the end of the pin that was holding it, and the load was shifted to outside hanger. The extra load on the remaining hanger started a fatigue crack at a sharp corner on the pin. When it failed catastrophically, the deck was supported at just three corners. When two heavy trucks and a car entered the section, the remaining expansion joint failed, and the deck crashed into the river below.

The ensuing investigation cited corrosion from water buildup due to inadequate drainage as a cause. During road mending some 10 years before, the highway drains had been deliberately blocked and the crew failed to unblock them when the road work was completed.[4] Rainwater leaked down through the pin bearings, causing them to rust. The outer bearings were fracture-critical and non-redundant, a design flaw of this particular type of structure. The bearings were difficult to inspect close-up, although traces of rust could be seen near the affected bearings.

The incident was also blamed on inadequate inspection resources in the state of Connecticut. At the time of the disaster, the state had just 12 engineers, working in pairs, assigned to inspect 3,425 bridges. The collapse came despite the nationwide inspection procedures brought about by the collapse of the Silver Bridge in West Virginia in December 1967.

Reaction

Northbound I-95 traffic was diverted onto US-1 and local streets in Greenwich for 6 months, causing the worst traffic problems the town had ever seen.[3] Only when a temporary truss carrying two lanes of northbound traffic opened in November 1983 could traffic be fully restored. In 1984, the state began a collective effort to fund a replacement bridge.

In 1986, a $150 million bridge replacement project began. A new northbound span opened in January 1989, which allowed the temporary northbound truss to be taken out of service and demolished. On the former site, a new southbound span was built. The southbound span opened in November 1992, after which the remainder of the original bridge was taken out of service and demolished. The replacement bridge completed in 1992 is a continuous girder and floorbeam design, which eliminated the need for pin and hanger assemblies that were implicated in the collapse of the original 1958 span. Related cosmetic work and the restoration of the beachfront underneath the bridge continued to affect the area through early 1993.

After the replacement of the Mianus River Bridge, governor William O'Neill proposed a US$5.5 billion transportation spending package to pay for rehabilitation and replacement of bridges and other transportation projects in Connecticut.[3]

See also

References

  1. "Mianus Bridge Disaster 1983". history.com. Retrieved 31 August 2012.
  2. Jeffrey, Schmalz (June 24, 1984). "Year after bridge collapse, questions and pain still linger.". New York Times. Retrieved 2015-07-26.
  3. 1 2 3 Nguyen, Hoa (August 2, 2007). "Deadly Mianus disaster recalled". The Advocate. Stamford, Connecticut. pp. 1, A4.
  4. "Mianus River Bridge Collapse". I-35W Bridge Collapse wiki. May 5, 2008.
This article is issued from Wikipedia - version of the 11/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.