Sharon (MBTA station)

This article is about a former New Haven Railroad station used by the MBTA. For the abandoned New York Central Railroad station in Amenia, New York, see Sharon (NYCRR station).
SHARON

Platforms and depot building at Sharon in November 2016
Location 1 Upland Road
Sharon, Massachusetts
Coordinates 42°07′29″N 71°11′02″W / 42.12475°N 71.18400°W / 42.12475; -71.18400Coordinates: 42°07′29″N 71°11′02″W / 42.12475°N 71.18400°W / 42.12475; -71.18400
Owned by MBTA
Line(s)
Platforms 2 side platforms
Tracks 2
Construction
Parking 546 spaces ($4.00 fee)
16 accessible spaces[1]
Bicycle facilities 8 spaces
Disabled access Yes
Other information
Fare zone 4
History
Opened June 1835
Rebuilt 1936
September 30, 2014
Traffic
Passengers (2013) 1,048 (weekday inbound average)[2]
Services
Preceding station   MBTA   Following station
Providence/Stoughton Line

Sharon is a commuter rail station on the MBTA's Providence/Stoughton Line located in Sharon, Massachusetts. The station has two separate entrances for inbound trains to Boston and for outbound trains to Providence and beyond. Sharon station is the only public transportation in the Sharon area, as there are no public bus lines in the town.

The station averages 1,048 inbound riders per day, placing it nineteenth on the system, though in previous years it has been reported to be in the top five.[2] New platforms were constructed in 2014 to make the station handicapped accessible.

History

1870s-built Sharon station on a 1908 postcard

The Boston and Providence Railroad started full operations between the two cities in June 1835, including a station at the modern location in Sharon.[3][4] In the 1870s, the original Sharon station was replaced by a larger building similar to those still extant at East Greenwich and Kingston in Rhode Island.[5] The Boston and Providence was leased by the Old Colony Railroad in 1888, which was in turn absorbed by the New York, New Haven & Hartford Railroad in 1893.[4]

The current inbound station building and the small outbound shelter were designed by F.J. Pitcher and built in 1936 by the New Haven Railroad. The station building was formerly a private business, but is now open to commuter rail riders.[5]

Penn Central took over New Haven Railroad commuter operations on January 1, 1969. On January 27, 1973, the MBTA acquired a number of Penn Central's Boston commuter lines, including the Providence/Stoughton Line.[6] In June 1973, the MBTA began subsidizing commuter rail service to Sharon. The town had been part of the MBTA district since 1964.[6]

Accessibility

Mini-high platforms at Sharon station in 2016

Until 2014, Sharon was the busiest station on the system that was not handicapped-accessible. All other stations with daily ridership above 1,000 passengers had accessible high-level platforms, as did all other stations on the busy Providence/Stoughton Line.[2] After an accessibility complaint was filed in May 2011, construction was mandated to take place by November 1, 2012. No construction took place in 2012, prompting concerns that the commuter rail stop - not just the building - would be closed.[7] On October 15, 2012, the state's Architectural Access Board granted the MBTA an extension until October 1, 2013 to make the station accessible.

The project, which included adding mini-high platforms and improving handicapped access to the building, was originally expected to begin in the spring of 2013 and to be completed that fall at a cost of $1.2 million.[8] In May 2013, the MBTA issued a request for bids for the then-$2.6 million project, with work to start in August.[9][10] Notice to Proceed was given to the chosen contractor on September 5, 2013, with work to be completed by February 2014.[9] Noise testing begun in April 2014, followed by ongoing construction of mini-high platforms as well as improvements to the building and parking lot.[11]

The accessible parking spots and the building retrofits were completed during May 2014, but construction of the platforms continued for several more months.[1] The mini-high platforms were opened on September 30, 2014, making Sharon fully handicapped accessible.[12]

Other Sharon stations

Sharon Heights station in the early 20th century

A station was located in Sharon Heights near Garden Street, about a mile south of Sharon proper.[3][4][13] It was closed sometime in the mid-20th century, at least a decade before the 1973 MBTA takeover.

In the late 1800s, a short-lived half-mile branch line led from Sharon Heights to a summer-only station at Lake Massapoag.[13] The branch was also used to haul ice from the lake to surrounding locales.[3] The remnants of the wye to the branch are still visible from passing trains on the main line.

References

  1. 1 2 "Sharon Disabilities Commission Minutes, May 28, 2014" (PDF). Sharon Disabilities Commission. 28 May 2014. Retrieved 5 July 2014.
  2. 1 2 3 "Ridership and Service Statistics" (PDF) (14 ed.). Massachusetts Bay Transportation Authority. 2014.
  3. 1 2 3 E. Robinson (1888). "Foxborough & Sharon 1888 Plate 45 - Sharon Heights, Franklin Center". Atlas of Norfolk County, 1888. WardMaps LLC. Retrieved 22 October 2012.
  4. 1 2 3 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 146–149. ISBN 0942147022.
  5. 1 2 Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. pp. 225–226. ISBN 9780942147087.
  6. 1 2 Belcher, Jonathan (31 August 2012). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved 23 October 2012.
  7. Salisbury, Phil (1 October 2012). "Sharon train station may close due to lack of handicap access". Wicked Local Sharon. Retrieved 22 October 2012.
  8. Vogler, Paula (18 October 2012). "Sharon commuter rail station gets access waiver extension". Wicked Local Sharon. Retrieved 22 October 2012.
  9. 1 2 Davey, Richard A. & Scott, Beverly A. (17 May 2013). "Notice to Bidders" (PDF). Massachusetts Bay Transportation Authority. Retrieved 20 May 2013.
  10. Barnes, Jennette (20 July 2013). "Train accessibility plan outlined". Boston Globe. Retrieved 21 July 2013.
  11. Taurasi, Liz (7 April 2014). "MBTA Work at Sharon Station Nightly Through April 25". Sharon Patch. Retrieved 8 April 2014.
  12. "Sharon Commission on Disabilities Minutes, October 22, 2014" (PDF). Sharon Disabilities Commission. October 22, 2014. Retrieved November 22, 2016.
  13. 1 2 George J. Varney & Rev. Elias Nason (1890). A gazetteer of the State of Massachusetts with numerous illustrations. B.B. Russell. pp. 588–589. Retrieved 22 October 2012.
Wikimedia Commons has media related to Sharon (MBTA station).
This article is issued from Wikipedia - version of the 11/25/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.