Southampton and Dorchester Railway

Southampton Central Station 1963

Southampton & Dorchester Railway

Legend
to Eastern Docks
South Western Main Line

Southampton Terminus
Southampton Tunnel
Southampton West End
(1847–95)
Southampton Central
(1895–)
to Western Docks
Millbrook
Redbridge
Wessex Main Line
River Test
Totton
Fawley branch railway
Ashurst (New Forest)
Beaulieu Road
Brockenhurst
Lymington Branch Line

Lymington Junction
Holmsley

South Western Main Line
to Bournemouth
Ringwood
Ringwood, Christchurch
& Bournemouth Railway

to
South Western Main Line
and Bournemouth
Ashley Heath
Salisbury & Dorset
Junction Railway
West Moors
Wimborne
Somerset & Dorset
Joint Railway

South Western Main Line
to Bournemouth
Broadstone
Poole
Creekmoor Halt

Poole Quay Line
Holes Bay Junction

Former Poole to
Hamworthy ferry

Holes Bay

Lower Hamworthy Goods
(Original Poole station)
Hamworthy Junction
Lake Halt
Holton Heath
Wareham
Worgret Junction
Swanage Railway
Wool
Wilts, Somerset
& Weymouth Rly
to Yeovil
Moreton

Dorchester South
Dorchester West

Wilts, Somerset
& Weymouth Rly
to
Weymouth
Unbuilt extension
to Exeter

The Southampton and Dorchester Railway was an English railway company formed to join the named towns, with hopes of forming part of a route from London to Exeter. It received Parliamentary authority in 1845 and opened in 1847. It was promoted by Charles Castleman of Wimborne and became known as Castleman's Corkscrew because of the meandering route it followed.[1][2]

Its route in the New Forest was determined by the requirements of the Commissioners of the Forest, and west of Brockenhurst it ran via Ringwood; at that time Bournemouth was not considered an important settlement; Poole was served by a branch to Lower Hamworthy, across a toll bridge from the town.

In the late nineteenth century, a shorter route via Christchurch and Bournemouth was built, and the line between Lymington Junction and Hamworthy Junction was reduced to the status of a local branch line, finally closing in the 1960s. However the end sections, from Southampton to Lymington Junction and from Hamworthy Junction to Dorchester, remain operational and form part of the important Weymouth to London main line.

Origins

The Southampton and Dorchester Railway in 1847

The London and Southampton Railway had been promoted with the intention of enabling a connection between the docks at Southampton and the capital. Sensing the opportunity to serve a wider area, that Company changed its name to the London and South Western Railway (LSWR) in 1839, and the Southampton main line was opened by the LSWR on 11 May 1840.[1]

The LSWR wished to expand its network towards Exeter, but had early on been frustrated by the success of the Great Western Railway (GWR) and its ally, the Bristol and Exeter Railway (B&ER) in extending into the region. Proposals were put forward as early as 1836[3] but it was not until 1847 that the company connected Salisbury in to its network, and that was a branch from Bishopstoke (Eastleigh), giving a circuitous route from London.

Before that, in 1844, Charles Castleman, a solicitor prominent in Wimborne Minster, had independently proposed a westward line from Southampton via Ringwood to Dorchester, and possibly on via Bridport to Exeter from there. Many railway schemes had been improbable in conception and Castleman went to some trouble to ensure a practicable and worthwhile scheme; Captain William Moorsom, an experienced railway engineer, was appointed by Castleman's committee of "respected local persons" to survey a route.[2]

Moorsom's route

Tank Engine "Alderney" at Southampton Docks 1947

He presented his report on 18 July 1844; his line would leave Southampton and run through Brockenhurst, Ringwood and Wimborne, then turning south to Poole and west again to Wareham and Dorchester. This alignment was far from direct, later earning the line the epithet "the Corkscrew" but Moorsom was confident that his line was cheaper and served more intermediate settlements than a direct line. Interests in Weymouth were dismayed that the line was to end (for the time being) in Dorchester; they were anticipating the loss of Channel Islands packet traffic (post and the transport of official documents by sea) to Southampton. Moorsom said that the difficult terrain made an approach to Weymouth expensive; atmospheric traction had been considered, but not taken further.[2]

At a public meeting on 19 July 1844 Moorsom's proposed route was accepted, and the Weymouth interest was appeased for the time being by a statement of intent to reach their town, and the possible renaming of the line The Southampton and Dorsetshire Railway; the renaming did not last long.[2]

Finding an ally

Southampton Docks, Town Quay, redundant railway lines, once a branch of the Southampton to Dorchester Railway

Castleman realised that he needed the support of a larger company, and the LSWR was the obvious choice, as it would bring traffic to them at Southampton, and enable them to extend to Exeter. He approached the LSWR with the idea but was rebuffed; evidently they wished to concentrate on reaching Exeter through Salisbury, and they hinted at branches from such a line into Dorset. In the ensuing controversy, Castleman's route became known as the Coastal Route to Exeter, and the route via Salisbury the Central Route. Castleman realised that it was unlikely that both routes would be built, and he pressed the LSWR for undertakings not to develop the Central Route; the larger company again rebuffed him and declined further discussion.

Castleman now took the bold step of offering his line to the rival Great Western Railway, in a letter dated 30 July 1844. Referring to the LSWR he said

... An act, however, of undoubted duplicity on their part, makes me fearful to trust them as they have a scheme of their own for supplying the County of Dorset by means of a line from Salisbury ...

He went on to suggest that the Central Route would abstract traffic from the GWR while his Coastal Route, built on the broad gauge and allied to them, would capture a large tract of territory for them.[4] The GWR agreed to discuss the matter, and after some weeks, a lease of the future line was signed by them.

Throughout its early existence, the LSWR had been at pains to secure territory in which it might be the dominant, or only, railway company, and the gauge of the track with which a new line was to be built determined its alliance with the broad gauge interests (the GWR, the B&ER and other associated companies) or railways with the standard gauge of 4 ft 8 12 in (1,435 mm). (In this context the latter were usually referred to as narrow gauge railways, and the competitive battles to ensure that new lines were specified to be built to the preferred gauge were referred to as the gauge wars.)

The LSWR were therefore alarmed at this development, as it would bring broad gauge trains into Southampton docks, the heart of territory the LSWR considered its own, and immediately promoted a rival scheme to reach Wimborne and Dorchester from Salisbury, which it had not yet reached. Opinion in local communities largely favoured the Southampton and Dorchester proposals, seeing the LSWR for the obstructive tactic that it was, and welcoming the competition that GWR alliance would bring to an area dominated by the GWR. Moreover, Weymouth would get its connection, through the broad gauge Wilts, Somerset and Weymouth Railway now being promoted; and some favoured a coastal line for its usefulness in defensive troop movements in the event of an attack by France. The major disadvantage was that there would be a break of gauge at Southampton for passengers and goods travelling between Dorset and London.[2]

The Parliamentary bill

Castleman was encouraged now, and Moorsom quickly completed the necessary plans of the route; the GWR guaranteed a 3½% dividend on S&DR shareholdings, and a Bill was presented to Parliament for the 1845 session.

There were 248 railway bills that session, and a Board of Trade Commission, the Railway Board, informally referred to as the Five Kings, was appointed to determine the relative merits of these schemes and numerous other potentially penetrating routes. At this period it was considered that only one route in any area was supportable, and therefore the Railway Board would choose which. The Five Kings found in favour of certain GWR routes and also the Southampton and Dorchester Railway, and against the LSWR's Central Route. This report was published on 31 December 1844, not mentioning the break of gauge. Shortly afterwards, however the Railway Board recommended that the S&DR line should be leased not to the GWR, but to the LSWR. At a stroke, the fortunes of the GWR and LSWR were reversed, and Castleman had got what he originally wanted.[5]

Lord Dalhousie, the chairman of the Railway Board, encouraged the LSWR, the GWR and Castleman to come to a territorial agreement: there was to be no encroachment into the others' territory without informing each other and the Board of Trade. The GWR lease of the S&DR was transferred to the LSWR.[2]

There was still work to do before going to Parliament, and Moorsom had to defend his planned route. Castleman had given a personal undertaking that the route within Southampton would be on the foreshore, across the Mudlands, and would probably have much improved trade in the lower town, but the LSWR were now in control. Castleman's preferred alignment would have enabled the reclamation of a considerable area of useless tidal mud. However the Pier Commissioners demanded the use of horses, and not locomotives, throughout the quays at Southampton, and the LSWR refused to give any such undertaking, and decided upon an alternative route that ran on the landward side of the town.[2]

An Act secured

Accordingly, the Southampton and Dorchester Railway got its Act of Parliament on 21 July 1845,[6] with authorised capital of £500,000. The lease to the LSWR was authorised in the Act. A branch from Hamworthy to the ballast quay at Poole was also authorised, and the broad gauge Wilts, Somerset and Weymouth Railway (authorised in the same session of Parliament) could be required to lay narrow gauge rails to give LSWR trains access to Weymouth.[5][6]

The line was to start from a junction near the LSWR Southampton station (later Southampton Terminus) and curve west through a tunnel; at this point the Act required a station to be built at Blechynden Terrace;[6][note 1] this became the present-day Southampton station. From there the line was to run westerly, crossing the River Test at Eling, and then run south-west to Brockenhurst.[6] The Commissioners of Woods and Forests intervened in the alignment of the route through the New Forest, and the intended route through Lyndhurst was not permitted, the line making a southward sweep near there.[6] From Brockenhurst the line was to run westward through Ringwood and Wimborne, trending south-west through Broadstone and Wareham, and then west to Dorchester.[6]

The line was planned as part of a through route to Exeter via Bridport, and the Dorchester terminus was aligned so as to enable this. The Poole Ballast Quay was at the eastern extremity of the spit of land south of the channel for Upton Lake.[2]

Disagreements with the LSWR

Although the LSWR had leased the line, the powers to build it rested with Castleman and his colleagues. An early question was whether to build the line as double track; Castleman argued that building as single and doubling later would cost much more, but the LSWR disagreed. Next the LSWR supported a London, Salisbury and Yeovil Railway and a scheme for an Exeter, Yeovil and Dorchester Railway. In retaliation the GWR sponsored an Exeter Great Western Railway. The support given to these schemes was in direct disregard of undertakings mutually given at Dalhousie's suggestion (see above), and the Southampton and Dorchester directors saw that their supposed protector was improperly sponsoring a line that would abstract from their own. Acrimonious personal accusations were made and some were published, and at a half-yearly meeting of the S&DR the grievances were aired; the outcome was that the LSWR forced another four of their own nominee directors—they already had four out of twelve—on to the S&DR board; with by far the largest block of shares they were easily able to do this.

Castleman was evidently furious and after further exchanges during the meeting he resigned. He was later persuaded to resume his duties as solicitor to the Company, but the LSWR was now in total control.

New Forest

The Act had left the route through the New Forest to be approved by the Commissioners for the Royal Woods and Forests, and they did not approve Moorsom's route. This proved contentious and at length I K Brunel was brought in to propose a compromise. It was not until July 1846 that agreement was made; by then the contractor Morton Peto had completed the Ringwood to Dorchester section by the previous November.

Opening at last

The railway was completed and opening was being planned for 1 June 1847;[7] but on 2 May 1847 there was a collapse of the newly constructed railway tunnel at Southampton. The damage extended about 100 yards and opened to the surface. It was at the western end of the rail tunnel and was caused by floodwater coming from a nearby disused canal tunnel.[8][9] This was quickly restored, but then on 30 May the interior of the tunnel suffered serious distortion; this was also caused by the disused canal tunnel, originally part of the Southampton and Salisbury Canal which the railway tunnel had been built above.[8][9][10]

When this was stabilised Captain Coddington, the Inspector from the Board of Trade, examined the line. He was satisfied with the standard of workmanship, but commented adversely on the narrow opening of the overbridges, and the fact that the entire line west of Redbridge was single line: the longest such length in England, he thought. He also criticised the sharp curve at Northam where the line joined the existing LSWR route; the company agreed to alter the curve to a larger radius.

On 20 May 1847 Coddington conducted the formal inspection of the line; this continued to the next day. The public opening was planned for 1 June,[7] with the Southampton tunnel still closed due to the collapse.[8] With no connection the mainline to London, the Blechynden terrace station was the terminus; the LSWR had to get their locomotives there by road through Southampton.[2][9] The Poole branch (to Hamworthy) opened at the same time.[7] The tunnel was eventually opened in August 1847.[9]

After opening day

Dorchester - Waterloo express at Parkstone (1958)

The Blechynden station was a temporary one because of a legal dispute; a permanent structure a little to the west came into use in 1850, later being renamed Southampton West. The section of line from Blechynden to the LSWR terminus only opened for traffic from the night of 5 and 6 August 1847, although there were passengers on a test train which ran on 29 July 1847.[5]

There was a serious collision on 20 September 1847, near Wool; the mail train from Dorchester was very late in reaching Wareham, and the station master there sent a pilot engine out on the single line to find out what was wrong. At a point on the line where forward visibility was limited on a curve, and there was a collision "of a fearful character". There were apparently only two passengers in the train, and they escaped without injury, but "considerable damage is done to both engines, and several carriages are said to be shattered".[11]

The LSWR was embarrassed by the public criticism of the lack of the electric telegraph, and installed it "by the end of the year".[12]

The stations at opening were:

The Dorchester station was aligned for extension towards Bridport and Exeter, but its location was probably chosen to enable a joint station with the Wilts Somerset and Weymouth line, with which the Southampton and Dorchester was friendly at the time of planning the route.[2]

In the short independent life of the Southampton and Dorchester Railway there was no change to the number of stations or their location, although Leonards Bridge may not have survived long.

In November 1846 the Company applied for Parliamentary powers for an ambitious group of extensions: a short branch to Eling, an industrial centre on an inlet from Southampton Water, and branches to Lymington, Blandford, and a line to Weymouth independent of the Wilts Somerset and Weymouth Railway. The Act obtained the Royal Assent in July 1847, but the financial collapse following the Railway Mania resulted in money becoming impossible to obtain. Only the short Eling line (usually referred to as the Eling Tramway) was built, opening probably in April 1851.

By Act of 22 July 1848, the Southampton and Dorchester Railway was authorised to be amalgamated with the LSWR, and this took effect on 11 October 1848.

Amalgamation with the LSWR

Down parcels train approaching Branksome station (1951)

The Southampton and Dorchester line was worked from the outset by the larger LSWR, and was closely bound to it. Amalgamation was an obvious next step, and this was finalised by Act of Parliament on 22 July 1848. Southampton and Dorchester shareholders received LSWR shares one to one. John Mills joined the LSWR board, but Castleman did not do so until 1855, becoming Chairman of the LSWR from 1873 to 1875.

Part of the LSWR

There were several major alterations of the original line after the change of ownership:

Weymouth over the rival line

Lady Wimborne Bridge was built to carry the Southampton & Dorchester Railway over the main drive to Canford House. The railway closed 3 May 1977

The Wilts, Somerset and Weymouth Railway (WS&WR) opened to Weymouth on 20 January 1857, and according to the terms of the original Acts, they had laid narrow gauge rails, so that LSWR trains could run to Weymouth. They had a separate station at Dorchester, and a sharply curved, single-line connection between the LSWR line and the WS&WR line was built, the boundary being at the midpoint. The curve diverged from the LSWR line a short distance east of their Dorchester station, so that down LSWR trains ran into the terminal platforms; they then reversed to east of the junction, and proceeded forward towards Weymouth. Up LSWR trains passed the point of junction and then reversed into the terminal platform.

The connection was doubled in 1878, and in 1880 a platform was provided on the curve for down trains; they could now run through normally, but up trains continued the reversing movement. This was perpetuated until a through up platform on the curve was provided as part of the Bournemouth Line Electrification in 1967, which provided enhanced non-electrified services to Weymouth.

Double track

The Southampton and Dorchester line was doubled in stages by the LSWR: from Southampton to Redbridge was double from the beginning, and from Redbridge to Wimborne was doubled by 1 September 1858,[5] and following pressure from the Board of Trade, the remainder to Dorchester was doubled by 1 August 1863.[2]

Southampton improvements

Trains from London to Dorchester had to enter the Southampton Terminus station of the original London and Southampton Railway, reversing to continue towards Dorchester. A curve was constructed enabling through running, opening to passengers on 2 August 1858, and on the same day Blechynden station was renamed Southampton West (or West End).[5][14]

Bournemouth

Bridge across former railway line, Ringwood

When the Southampton and Dorchester line had been conceived, Bournemouth was an insignificant hamlet, and there was no reason to make a railway connection. As sea bathing, and seaside holidays, developed, Bournemouth grew considerably. The town was reached by the opening of the Ringwood, Christchurch and Bournemouth Railway which opened a line to the town on 14 March 1870. The route was still circuitous, and was a branch off the main line, so that many express passenger trains divided at Brockenhurst, with separate portions for Weymouth via Ringwood and Bournemouth via Christchurch.

It was not until 5 March 1888 that the LSWR opened the Sway line, running direct from Lymington Junction (near Brockenhurst) to Christchurch, and the connecting line through Bournemouth. The Ringwood route was now relegated to rural branch line status, although occasional through passenger trains took the route on summer Saturdays in the twentieth century.

Poole

As described above, Poole had a station on the south side of the Quay Channel, and road access to Poole itself was over a toll bridge. The branch line to this Poole station made an east-facing junction with the main line at what is now Hamworthy station, then called Poole Junction. The branch seems to have extended eastwards from Poole station to a "Ballast Quay" at the eastern extremity of the headland.

From 1 November 1860 the Dorset Central Railway opened its line as far as Wimborne. Their engines were serviced there, and LSWR engines took their goods wagons on to Poole. Moreover, as the price for the Dorset Central dropping a proposal to extend its own line to Poole, the LSWR was obliged to take Dorset Central through passenger coaches to Poole from Wimborne.[15] The Dorset Central was later a constituent of the Somerset and Dorset Railway

On 2 December 1872 the LSWR opened a new connecting line from what became Broadstone station via Hamworthy to a Poole station in the town itself. The later Broadstone station was in fact called New Poole Junction at first, in contrast to Poole Junction which was renamed Hamworthy Junction on the same day. The old Poole station was renamed Hamworthy, and continued in passenger service until 1 July 1896 when it was reduced to goods-only status.

New Poole Junction was renamed Poole Junction in January 1875, and after further renamings became Broadstone. Passengers from Poole to Dorchester had to change trains at Broadstone until the Holes Bay line (Holes Bay Junction to Hamworthy Junction) opened in 1893.

Stations after amalgamation

The stations on the route have experienced some changes:

The line today

The Southampton and Dorchester line in the context of modern routes

The line remains open from Southampton to the site of Lymington Junction, a mile west of Brockenhurst, and from Hamworthy Junction to Dorchester.

The middle section, between Lymington Junction and Hamworthy Junction closed to passenger traffic on 4 May 1964,[19] although part of this section was kept open for freight access to private sidings for some time. Track lifting began on the section between Lymington Junction and Ringwood, being completed in 1965.

The line from Broadstone to Hamworthy Junction was closed to freight in 1966. Freight traffic continued to Ringwood until August 1967 before being truncated yet again, this time back to a military fuel dump at West Moors. Trains continued to serve West Moors until 1974, before being cut back further still to Wimborne. A light freight service and the use of the sidings at Wimborne for stabling of an exhibition train kept the line open for a further 3 years. Finally the remaining stub from Holes Bay Junction to Wimborne was closed in 1977.

Present-day passenger trains between London and Weymouth run from Lymington Junction via Christchurch and Bournemouth on the South Western Main Line. The mileposts along the surviving portions of the Southampton & Dorchester Railway west of Hamworthy Junction are measured from London Waterloo via the direct route through Sway, Bournemouth and Poole.[20] However, bridges on that route section retain their numbering via the Ringwood route from Southampton.

The disused portion between Ringwood and Hamworthy Junction forms the Castleman Trailway,[21] a path which passes through the villages of Ashley Heath, West Moors, Oakley, Broadstone and Upton, as well as Upton Heath, Upton Country Park and Moors Valley Country Park[21]

A report from the Association of Train Operating Companies (ATOC) published in June 2009 recommended the rebuilding of part of the line from Brockenhurst to Ringwood. It looked into the feasibility of reopening disused lines and stations, and concluded that there was a business case for investing £70m in the new link with an hourly service.[22]

Notes

  1. Some references (Williams, Butt) give the spelling Bletchynden; this seems to be a mistake: Blechynden is given by Cox, writing for the City of Southampton; by Bradshaw 1850 (facsimile edition from Middleton Press); and street names from near-contemporary Ordnance Survey maps; and it is referred to as the Blechynden Terrace station in Southampton Borough Council minutes (page 160 in Patterson).

References

  1. 1 2 R A Williams, The London & South Western Railway, volume 1, David & Charles, Newton Abbot, 1968, ISBN 0 7153 4188 X
  2. 1 2 3 4 5 6 7 8 9 10 11 J G Cox, Castleman's Corkscrew: The Southampton and Dorchester Railway 1844 - 1848, published by the City of Southampton, 1975
  3. Williams, volume 1 page 54
  4. Letter from Castleman to Chairman of the GWR, dated 30 July 1844, quoted extensively in Cox.
  5. 1 2 3 4 5 Williams, volume 1, chapter 3
  6. 1 2 3 4 5 6 "Act of Parliament 21st July 1845 - Southampton and Dorchester Railway Act". London Gazette. 5508. 21 July 1845.
  7. 1 2 3 "Southern Counties Railway Stations List – Hampshire, Dorset and the Isle of Wight". 2013 Southern Counties Railway Society. Retrieved 2013-12-21.
  8. 1 2 3 Oates, Peter. "Southampton and Salisbury Canal - The Aftermath". Southampton Canal Society 2009. Retrieved 2013-12-21.
  9. 1 2 3 4 Sackley, Neil (27 November 2009). "Southampton railway tunnel's past". BBC Hampshire & Isle of Wight. BBC News UK. Retrieved 2013-12-22.
  10. Russell 1971, pp. 41–42
  11. Illustrated London News (periodical), September 1847; Cox gives a different explanation for the station master's instructions; he quotes the Poole and Dorsetshire Herald, 23 September 1847, which said there were three passengers.
  12. Poole and Dorsetshire Herald, 23 December 1847, quoted in Cox
  13. Cox quotes the Poole and Dorsetshire Herald 23 April 1846, and a letter from Chaplin to de Mauley in the British Transport Historical Records
  14. 1 2 Vic Mitchell and Keith Smith, South Coast Railways: Southampton to Bournemouth, Middleton Press, Midhurst, second edition 1998, ISBN 0 906520 42 8
  15. 1 2 Williams, volume 1 page 194
  16. Butt
  17. Hantsphere web page: Totton station
  18. Vic Mitchell and Keith Smith, Branch Lines Around Wimborne, Middleton Press, Midhurst, 1992, ISBN 0 906520 97 5
  19. "PastScape - Southampton and Dorchester Railway". PastScape.org [Heritage Data Management]. English Heritage 2007. Retrieved 2013-12-21.
  20. John Yonge and Gerald Jacobs, (editors), Railway Track Diagrams 5: Southern & TfL, published by Trackmaps, Bradford on Avon, 2008, ISBN 978-0-9549866-4-3
  21. 1 2 50°44′17″N 2°01′41″W / 50.738°N 2.028°W
  22. "Connecting Communities - expanding access to the rail network" (PDF). London: Association of Train Operating Companies. June 2009. p. 19. Archived from the original (pdf) on 29 July 2013. Retrieved 20 February 2015.

Bibliography

  • R V J Butt, The Directory of Railway Stations, Patrick Stephens Ltd, Sparkford, 1995 ISBN 1-85260-508-1
  • J H Lucking, Railways of Dorset, Railway Correspondence and Travel Society, 1968
  • B L Jackson, Castleman's Corkscrew, Oakwood Press, 2007, ISBN 978-0-85361-666-5
  • Vic Mitchell and Keith Smith, Branch Lines Around Wimborne, Middleton Press, Midhurst, 1992, ISBN 0-906520-97-5
  • Leslie Oppitz, Lost Railways of Dorset, Countryside Books, 2001, ISBN 1853066966
  • Russell, Ronald (1971). Lost Canals of England and Wales. David and Charles. ISBN 0-7153-5417-5. 
  • Alfred Temple Patterson, A Selection from the Southampton Corporation Journals, 1815-35, and Borough Council Minutes, 1835-47, Southampton at the University Press, 1965, ISBN 0854323457
  • Bradshaw's Rail Times for Great Britain and Ireland, March 1850, facsimile edition, Middleton Press, Midhurst, 2012, ISBN 978 1-908174-13-0
This article is issued from Wikipedia - version of the 12/3/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.