Spotsylvania station

Spotsylvania

Spotsylvania station under construction in October 2015
Location 9442 Crossroads Parkway
Fredericksburg, Virginia
United States
Coordinates 38°13′17″N 77°26′28″W / 38.2214°N 77.4410°W / 38.2214; -77.4410Coordinates: 38°13′17″N 77°26′28″W / 38.2214°N 77.4410°W / 38.2214; -77.4410
Owned by Spotsylvania County
Operated by Virginia Railway Express
Line(s) RF&P Subdivision
Platforms 1 side platform
Tracks 3
Construction
Parking 1500 spaces [1]
Disabled access Yes
Other information
Fare zone 9
History
Opened November 16, 2015[1][2]
Traffic
Passengers (2015) 1,300 daily (expected)[3]
Services
Preceding station   Virginia Railway Express   Following station
TerminusFredericksburg Line

Spotsylvania is a commuter rail station on the Virginia Railway Express Fredericksburg Line, located off US Route 17 in Spotsylvania County, Virginia, about 5 miles (8.0 km) south of downtown Fredericksburg. It opened on November 16, 2015 – the first extension of VRE service since its opening.[1][2]

The station consists of a 700-foot (210 m)-long low-level platform with a canopy and a small headhouse with restrooms.[4][5] The station has 1500 parking spaces for commuters.[1]

History

Initial plans

Since its opening in July 1992, the Fredericksburg Line had terminated at its namesake city. Spotsylvania was not included in the 1992 VRE network because the county was not part of the original funding district.[6] However, the Fredericksburg lot served a substantial number of commuters from Spotsylvania County – between 900 and 1000 daily by 2012. This caused capacity problems at the lot and prevented local residents from parking there.[3] In 2004, VRE's Strategic Plan indicated the possibility of a station in Spotsylvania at a Route 17 site, citing existing ridership from the county and the need for increased parking, as well as noting that the extension could be constructed relatively cheaply, allowing for near-term implementation.[6]

Joining VRE

On August 18, 2009, the Spotsylvania County Board of Supervisors voted to join VRE. In September 2009, they additionally voted to join its associated funding district, the Potomac and Rappahannock Transportation Commission (PRTC).[7][8] The North Virginia Transportation Commission (NVTC) approved the decision (which included provisions for a VRE station in Spotsylvania) in November 2009, and Spotsylvania joined VRE and the PRTC in February 2010.[7] In August 2010, a Spotsylvania-funded study indicated that a site just south of Route 17 was the optimum location for the station.[7] The Spotsylvania County Board of Supervisors approved the site in October 2010.[9]

Planning and delays

The VRE board issued preliminary approval of the extension in June 2012 and devoted about $400,000 in VRE funds to the project.[10]

A Department of Environmental Quality public comment period regarding the third track lasted from January to February 2013.[11] Design work started in June 2012 and was finished by March 2013.[12] In March 2013, the VRE board voted to issue an invitation for bids, due in in May 2013.[13][14] On May 17, the board issued a $2,349,000 contract to Hammerhead Construction for station construction, with work intended to begin in June.[12] A $8 million contract for the third track was awarded in June.[15] A $20 million contract with CSX Transportation was approved in September 2013; this signing allowed construction but work did not yet begin.[16]

The station was originally planned to open in December 2013, but this was delayed several times. A completion date of March 2014 with the third track several months later was announced in September 2013.[16] A later date of June 2014 was announced in November 2013 due to delays in negotiations, as the owners of the property upon which the third track and parking lot will be built disputed the price they were to be paid for the land.[17] Construction on the third track started in early 2014, but not on the parking lot and station, due to a continued lack of agreement. In May 2014, VDOT took over negotiations from the county, as the state agency had more power of eminent domain.[18]

In July 2014, VDOT filed a certificate of take in a county court, which the property owners consented to; this allowed the land to be transferred even without a final agreement on the sale price.[19] Bidding for the parking lot and roadway construction opened on July 25, 2014, with bids due on August 27.[20][19][21] The $7.3 million lowest bid was selected in September 2014.[22]

Construction

A groundbreaking ceremony was held on August 12, 2014.[23] By then the third track and station were to be complete by February 2015, but parking lot construction would take eight months to complete, further delaying opening until July 2015.[20][23] At the groundbreaking, officials stated that the station might open as soon as December 2014 even if the parking lot was not yet complete, but this did not come to fruition.[24]

In March 2015, the VRE board voted to terminate the $8.7 million contract with one company, which had been working on the third track project, due to numerous safety violations. The termination was expected to delay the third track but not the station opening.[25] Negotiations about the cost of the parking land failed in 2015; the case will go to trial in May 2016.[26] By July 2015 the station was planned to open in September, though work on the third track did not resume until August 2015.[26][27][28]

Opening

On October 26, 2015, VRE announced that the station would open at the start of service on November 16, 2015.[2][29] The station saw full service on the 16th, with a mid-morning ribbon-cutting ceremony.[1] It was the first extension of VRE service since its 1992, but not the first station added to the system – Lorton and Franconia-Springfield opened as infill stations in the mid-1990s.[30]

During the first week of operations, daily ridership at Spotsylvania averaged 550 boardings.[31] The third track opened on May 17, 2016.[32] Later that month, an agreement for a price of $3 million – substantially higher than VRE's original offer – was reached for the purchase of the parking lot property.[33]

Funding

The station itself cost $3.4 million to build, while the associated 2.6 miles of third track with high-speed crossovers cost $32.5 million.[10] The project was funded by state funds and by Spotsylvania County.[34] Funding for operations on the extension comes from Spotsylvania County.[3] In August 2012, the county announced that revenues from bond sales would be used to fund the extension.[35]

VRE oversaw the design and construction of the station for the county.[34]

References

  1. 1 2 3 4 5 Lazo, Luz (15 November 2015). "VRE Spotsylvania station to open Monday". Washington Post. Retrieved 16 November 2015.
  2. 1 2 3 "VRE to Open New Spotsylvania VRE Station" (Press release). Virginia Railway Express. 26 October 2015. Retrieved 27 October 2015.
  3. 1 2 3 Weir, Kytja (4 July 2012). "VRE to expand into Spotsylvania County". Washington Examiner.
  4. STV Inc. (27 March 2013). "Spotsylvania Station" (PDF). Virginia Railway Express. Archived from the original (PDF) on 27 September 2013.
  5. "Spotsylvania (Opening Nov.16, 2015)". Virginia Railway Express. Archived from the original on 17 November 2015.
  6. 1 2 Parsons, Brinckerhoff, Quade & Douglas Inc. (May 2004). "Potential Network Expansion" (PDF). VRE Strategic Plan. pp. 85–86. Archived from the original (PDF) on 14 April 2015.
  7. 1 2 3 HDR Engineering (4 August 2010). "Spotsylvania County VRE Commuter Rail Station Site Screening Analysis: Final Technical Memorandum" (PDF). Spotsylvania County. Archived from the original (PDF) on 5 August 2014. Retrieved 17 January 2013.
  8. Anthony J. Romanello & Joseph L. Howard (8 September 2009). "Action Item: Board of Supervisors" (PDF). Stafford Board of Supervisors. Retrieved 17 May 2013.
  9. Spotsylvania County Board of Supervisors (26 October 2010). "Agenda: October 26, 2010—Brief Update" (PDF). Spotsylvania County. Archived from the original (PDF) on 14 August 2014.
  10. 1 2 Shenk, Scott (15 June 2012). "VRE makes moves on Spotsylvania station, third track". The Free Lance-Star. Retrieved 18 January 2013.
  11. "Public Notice – Environmental Project" (PDF). Virginia Department of Environmental Quality. Archived from the original (PDF) on 2 February 2013. Retrieved 18 January 2013.
  12. 1 2 Allen, Doug (17 May 2013). "Authorization to Award a Contract for Construction of the Spotsylvania Station Project". Virginia Railway Express. Retrieved 17 May 2013.
  13. Allen, Doug (15 March 2013). "AGENDA ITEM 8-A CONSENT AGENDA ITEM". Virginia Railway Express. Retrieved 3 April 2013.
  14. Shenk, Scott (15 March 2013). "Spotsylvania another step closer to new VRE station". Fredericksburg News. Retrieved 17 November 2015.
  15. Shenk, Scott (21 June 2013). "VRE picks builder for Spotsylvania third track project". Fredricksburg News. Retrieved 25 June 2013.
  16. 1 2 Shenk, Scott (20 September 2013). "Spotsylvania VRE station opening pushed back". Fredericksburg News. Retrieved 22 September 2013.
  17. Shenk, Scott (15 November 2013). "VRE station in Spotsy pushed back again". Fredericksburg News. Retrieved 15 November 2013.
  18. Shenk, Scott (11 May 2014). "GETTING THERE: Spotsylvania VRE station stalled over parking lot". Fredericksburg News. Archived from the original on 1 June 2014. Retrieved 1 June 2014.
  19. 1 2 Shenk, Scott (29 July 2014). "Spotsy ready to roll on new VRE station". Fredericksburg News. Retrieved 5 August 2014.
  20. 1 2 "INVITATION FOR BID (IFB) #14-03-21 Virginia Railway Express (VRE) Station Parking Lot & Site Access Improvements Construction Project" (PDF). County of Spotsylvania, Procurement Division. 25 July 2014. Archived from the original (PDF) on 5 August 2015. Retrieved 5 August 2014.
  21. "Attachment A: Bid Form, Virginia Railway Express (VRE) Station Parking Lot, Site Access Improvements Construction Project" (PDF). County of Spotsylvania, Procurement Division. 25 July 2014. Archived from the original (PDF) on 5 August 2014. Retrieved 5 August 2014.
  22. Shenk, Scott (10 September 2014). "Contractor picked for VRE station lot project in Spotsy". The Lance Free-Star. Retrieved 11 September 2014.
  23. 1 2 "Spotsylvania and VRE to Construct New Station" (PDF) (Press release). Virginia Railway Express. 6 August 2014. Retrieved 9 August 2014.
  24. Shenk, Scott (12 August 2014). "Officials break ground at Spotsylvania VRE station". Fredericksburg News. Retrieved 14 August 2014.
  25. Shenk, Scott (21 March 2015). "VRE to cancel contract with third-track contractor". The Free Lance-Star. Retrieved 21 March 2015.
  26. 1 2 Shenk, Scott (9 July 2015). "Spotsylvania VRE station expected to open in late summer: DESPITE SETBACKS, SPOTSY DEPOT COULD BE READY FOR COMMUTERS BY SEPTEMBER". Free Lance-Star. Retrieved 11 July 2015.
  27. Shenk, Scott (16 November 2015). "First VRE trains leave new Spotsylvania station". Free Lance-Star. Retrieved 16 November 2015.
  28. Shenk, Scott (11 April 2016). "VRE third track expected to open this month". Free Lance-Star. Retrieved 12 April 2016.
  29. Lazo, Luz (26 October 2015). "VRE's Spotsylvania station to open next month". Washington Post. Retrieved 27 October 2015.
  30. Taube, Richard K. (11 August 2008). "Chronology of the Virginia Railway Express: 1964 to Present" (PDF). Virginia Railway Express. Retrieved 16 November 2015.
  31. "Editorial: Riders, officials hail Spotsylvania's VRE station". Fredericksburg News. 22 November 2015. Retrieved 23 November 2015.
  32. "VRE Completes Spotsylvania Third Track Project". Fredericksburg Today. 18 May 2016. Retrieved 20 May 2016.
  33. Branscome, Jeff (22 May 2016). "VDOT and Spotsylvania agree to pay millions for VRE parking lot". Fredericksburg News. Retrieved 22 May 2016.
  34. 1 2 Zehner, Dale (15 July 2012). "AGENDA ITEM 9-F ACTION ITEM". Virginia Railway Express. Retrieved 17 January 2013.
  35. "Spotsylvania, Va." (PDF). Commuter Update. Virginia Railway Express. August 2012. Archived from the original (PDF) on 20 January 2013.
This article is issued from Wikipedia - version of the 10/24/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.