Tryfan Junction railway station
Tryfan Junction | |
---|---|
Location | |
Area | Gwynedd |
Coordinates | 53°06′29″N 4°14′23″W / 53.10795°N 4.23975°WCoordinates: 53°06′29″N 4°14′23″W / 53.10795°N 4.23975°W |
Grid reference | SH501590 |
Operations | |
Original company | North Wales Narrow Gauge Railways |
Managed by | Welsh Highland Heritage Group |
Owned by | Festiniog Railway |
Platforms | 1 |
History | |
1877 | Opened |
26 September 1936 | Closed |
2011 | Re-opened as request stop |
Stations on heritage railways in the United Kingdom | |
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z | |
UK Railways portal |
A former junction station on the North Wales Narrow Gauge Railways for the main line and the Bryngwyn Branch.
History
Originally built for the opening of traffic in 1877 by the North Wales Narrow Gauge Railways Company, the building became redundant when passenger services ceased on the Bryngwyn branch in 1916. The station building fell into disrepair following its closure in 1936 by the Welsh Highland Railway and it eventually became a roofless ruin.
This section of the WHR was restored in 2000 and work began in earnest 2009 on restoration of the station under the leadership of by the late John Keylock and driven by the determination of a small band of volunteers from the Welsh Highland Heritage Group. The first part, reconstruction of a platform, was completed in Spring 2010, but the only train to stop there in 2010 was a single "Sponsors Special". In 2011 with the commencement of the main operating season, it became a timetabled request stop. Work on the building continued and was completed in 2014.
For its extensive reconstruction of the building, the Welsh Highland Railway Heritage Group received the 2014 Volunteers' Award of the National Railway Heritage Awards scheme. On a very wet and windy Saturday, 2nd May 2015, some 40 people squeezed into the restored Tryfan Junction Station building. where John Ellis, chairman of National Railway Heritage Awards gave a brief speech. Sir Peter Hendy CBE, Commissioner Transport for London (now chairman of Network Rail) then unveiled the blue NRHA plaque to commemorate the award.
At the meeting the former chairman of the WHR Heritage Group, David Allan also paid tribute to the foresight and imagination of John Keylock who had died before seeing his dream completely realised. A commemorative slate tablet in the garden at the station carries John Keylock’s sign off comment in his many telephone calls to David and others “Speak Anon” [1]
Work continues to improve the facilities and heritage scene at Tryfan Junction which is now the ‘gateway’ to The Slate Trail along the trackbed of the closed Bryngwyn Branch.
Preceding station | Heritage railways | Following station | ||
---|---|---|---|---|
Dinas | Welsh Highland Railway | Waunfawr | ||
Historical railways | ||||
Dinas Junction | Welsh Highland Railway | Waunfawr | ||
junction station | Bryngwyn Branch | Rhostryfan |
See also
References
- ↑ Welsh Highland Railway Heritage Group
- Boyd, James I.C. (1988) [1972]. Narrow Gauge Railways in South Caernarvonshire - Volume 1. Headington, Oxford: The Oakwood Press. ISBN 978-0-85361-365-7. OCLC 20417464.
Southern, Dave & Keylock, John; (2014) The Bryngwyn Branch, Welsh Highland Railway Heritage Group,ISBN 978-0-9930821-0-8
External links
- Welsh Highland History, The Bryngwyn Branch
- The Restoration project
- A Glimpse of the Early Days of the North Wales Narrow Gauge Railway
- Video footage of Tryfan Junction