USS Westmoreland (APA-104)

History
United States
Namesake: Counties in Pennsylvania and Virginia
Builder: Ingalls Shipbuilding
Laid down: 8 December 1943
Launched: 28 April 1944
Christened: USS Westmoreland
Commissioned: 18 January 1945
Decommissioned: 5 June 1946
Renamed: Steel King
Struck: 19 June 1946
Fate: Unknown, last registered 1974
Notes:
General characteristics
Class and type: Bayfield-class attack transport
Displacement: 8,100 tons, 16,100 tons fully loaded
Length: 492 ft (150 m)
Beam: 69 ft 6 in (21.18 m)
Draft: 26 ft 6 in (8.08 m)
Propulsion: General Electric geared turbine, 2 x Foster Wheeler D-type boilers, single propeller, designed shaft horsepower 8,500
Speed: 18 knots
Boats & landing
craft carried:
12 x LCVP, 4 x LCM (Mk-6), 3 x LCP(L) (MK-IV)
Capacity: 4,500 tons (180,500 cu. ft).
Complement:
  • Crew: 51 officers, 524 enlisted
  • Flag: 43 officers, 108 enlisted.
  • Troops: 80 officers, 1,146 enlisted
Armament:

USS Westmoreland (APA-104) was a Bayfield-class attack transport that served with the US Navy during World War II.

Westmoreland was laid down under a Maritime Commission contract (MC hull 872) on 8 December 1943 at Pascagoula, Mississippi, by Ingalls Shipbuilding, launched on 28 April 1944, and placed in reduced commission for ferrying purposes, on 12 July 1944. Shifted to Todd Shipyards of Hoboken, New Jersey, for conversion to an attack transport, the ship was decommissioned on 22 July for the duration of the yard period. Once the task of fitting the ship out as an attack transport was completed, Westmoreland was placed in commission on 18 January 1945, Capt. James M. Hicks in command.

Operational history

After spending most of February on shakedown in Chesapeake Bay, Westmoreland sailed for the Pacific on 22 February and arrived at the eastern entrance to the Panama Canal on the 27th. After transiting the canal, the attack transport pushed on for the Hawaiian Islands and reached Pearl Harbor on 14 March.

Transport and training operations

After training in Hawaiian waters, the ship returned to the west coast at the end of May for voyage repairs at San Pedro, California. In mid-June, she shifted northward to load troops and cargo at Portland, Oregon, for transportation to Hawaii. Westmoreland subsequently conducted one round-trip voyage between Pearl Harbor and San Francisco in July and then spent most of the first half of the month of August on exercises and further training in Hawaiian waters. During that time, the Japanese, worn down by ceaseless Allied pounding from the air and from the sea, surrendered on 15 August 1945.

Occupation and demobilization missions

Although Westmoreland had been commissioned too late to participate in combat against the Japanese in the Pacific, she nevertheless did take part in the massive reverse movement of men back to the United States, Operation Magic Carpet. The attack transport subsequently called at Manila, in the Philippines, and Sasebo, Japan, operating with Transport Squadron 22, and brought back troops to Portland, before she returned to the Philippines once more. She carried a draft of troops from Samar to San Francisco before heading for the East Coast of the United States.

She transited the Panama Canal on 8 April 1946 and arrived at Norfolk five days later. Westmoreland was decommissioned there on 5 June 1946 and was struck from the Navy List on 19 June.

Commercial service

Acquired by the Isthmian Steamship Company (later called Isthmian Lines) in July 1947, Westmoreland was renamed Steel King. The former attack transport carried general cargo for her company until about 1974, when her name disappeared from contemporary shipping registers.

References


This article is issued from Wikipedia - version of the 6/5/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.