China Railways CRH3

China Railways CRH3 EMU

In service 2008 – present
Manufacturer Siemens,
Tangshan Railway Vehicle
Changchun Railway Vehicle
Family name Siemens Velaro
Number under construction CRH380B: 40 trainsets (320 cars)
CRH380BL: 100 trainsets (1600 cars)
CRH380CL: 25 trainsets (400 cars)
Number built CRH3C: 80 trainsets (640 cars)
CRH380B: 10 trainsets (80 cars)
CRH380BL: 70 trainsets (1120 cars)
CRH380CL: 1 trainset (16 cars)
Formation CRH3A, CRH3C, CRH380B: 8 cars/trainset (4M4T)
CRH380BL, CRH380CL: 16 cars/trainset (8M8T)
Capacity CRH3A: 728[1]
CRH3C: 556-600
CRH380B: 551[1]
CRH380BL: 1043[1]
CRH380CL: 1053[1]
Operator(s) Chinese Ministry of Railways
- Beijing Railway Bureau
- Guangzhou Railway Group
Line(s) served Beijing-Tianjin Intercity Railway
Harbin-Dalian High-Speed Railway
Specifications
Train length CRH3A, CRH3C, CRH380B: 200 m (656 ft 2 in)
CRH380BL: 399.27 m (1,309 ft 11 14 in)
Width 3,265 mm (10 ft 8 12 in)
Height 3,890 mm (12 ft 9 18 in)
Platform height 1,250 mm (4 ft 1 in)[2]
Maximum speed CRH3A: 160 km/h (99 mph) to 250 km/h (155 mph)[1]
CRH3C: 350 km/h (217 mph)
CRH380B, CRH380BL, CRH380CL: 380 km/h (236 mph)
Weight CRH3C: 447 t (440 long tons; 493 short tons)[3]
CRH380BL: 980 t (960 long tons; 1,080 short tons)[4]
Traction system Siemens or Hitachi IGBT VVVF inverter control
Power output CRH3A: 5.12 MW (6,870 hp)[1]
CRH3C: 8.8 MW (11,800 hp)[3]
CRH380B: 9.2 MW (12,300 hp)[1]
CRH380BL: 18.4 MW (24,700 hp)[5]
CRH380CL: 19.2 MW (25,700 hp)[1]
Transmission AC-DC-AC
Power supply (?)
Electric system(s) 25 kV 50 Hz AC[3]Overhead line[3]
Current collection method Pantograph
Braking system(s) Regenerative, electronically controlled pneumatic brakes
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge[3]

The CRH3 is a version of the Siemens Velaro high-speed train used in China on the Beijing–Tianjin Intercity Railway line, Wuhan-Guangzhou Passenger Dedicated Line, Zhengzhou-Xi'an Passenger Dedicated Line and the Shanghai–Nanjing Intercity Railway. It is capable of service speed of 380 km/h (236 mph) as the very similar Velaro E used in Spain, but, similarly to the Sapsan, it is 300 mm (11.8 in) wider to take advantage of a more generous structure gauge and thus be able to fit in more seats in a 2+3 layout.

History

In November 2005 the Ministry of Railways ordered 60 Velaro trains for use on the Beijing-Tianjin high-speed rail line. On 27 July 2006, the joint project office was opened at Tangshan.[6]

CRH3A

The first three trains were built in Germany by Siemens, and these imported trains were labelled CRH3A (CRH3-002A, CRH3-003A and CRH3-004A). These trains are based on the German Deutsche Bahn's ICE 3 high-speed trains and were given initial designations of CRH3A. Of these German trains, the first one was shipped from Bremerhaven on 19 December 2007.[7]

On 30 November 2012, the CNR announced new design of CRH3A, with three styles that can operate at top speed of 160 km/h, 200 km/h and 250 km/h. The first train was rolled out on June 3, 2013.[8]

CRH3C

After December 2008, the three imported CRH3A were repainted and renamed to CRH3C (CRH3-002C, CRH3-003C and CRH3-004C). The rest of the trains are now being built by Tangshan Railway Vehicle with some components from Germany.[9]

The first Chinese-built CRH3 (CRH3-001C) was unveiled on 11 April 2008.[9]

The 8-car CRH3C trains are similar to the Velaro E design in Spain, but 300 mm (11.8 in) wider to fit more seats in a 2+3 layout; a 200 m (656 ft) CRH3 train will seat 548 passengers: 16 deluxe-class (8 sold publicly), 50 in first-class, 490 in second-class.[2]

Each train sets consists of four motor cars and four trailer cars, equipped with two driving units, and each of them is in charge of the driving of two motor cars and two trailer cars.

The bogies are improved versions of the SF500 bogie. Innovations include the body bolster, vibration damper, spring parameters, transmission ratio, widening the carbody and increasing the speed of the trainsets.[10]

The trains are designed for running at 350 km/h (217 mph). On 24 June 2008, CRH3-001C reached a top speed of 394.3 km/h (245.0 mph) during a test on the Beijing to Tianjin high speed line.[11]

On 9 December 2009, a pair of CRH3 EMUs (CRH3-013C + CRH3-017C) reached a top speed of 394.2 km/h (245 mph) during a test on the Zhengzhou to Xi'an high speed line,[12] setting a world record for double-link EMUs.

On 28 September 2009, an additional 20 CRH3C sets was ordered by the Chinese MOR.[13]

CRH3C trains entering and leaving Shaoguan Railway Station

CRH380B/BL

In March 2009, a new contract was signed with China Northern Railways (CNR) to supply 100 16-car trainsets for 39.2B RMB with delivery from October 2010 onwards. This order for a total of 1600 railway cars is greater than the total production of all Velaro and ICE trains that have ever been manufactured in the past. It is planned that the trains will be produced by CNR subsidiaries, Tangshan Railway Vehicles and Changchun Railway Vehicles, using technology from the previous technology transfer agreement. In this contract, Siemens acts as a component supplier, with 85% of the content actually made by the company.[14] An additional order for 40 16-car sets and 40 8-car sets was made on 28 September 2009 for 25.32B RMB.[15]

Top travel speed for this variant is 380 km/h (236 mph), though it is capable of attaining even higher speeds.[16] These trains have been designated as CRH380B (8-car set) and CRH380BL (16-car set) in September 2010.[17] The first CRH380BL set with series number CRH380B-6401L rolled off the production line and was unveiled to the public in September 2010. it was manufactured by Tangshan Railway Vehicle.[18] On October 2010, the 16-car train was sent to Beijing loop line for test. On November 2010, the train was sent to Beijing-Shanghai High-Speed Railway for trial run. The trainset reached the maximum speed of 457 km/h (284 mph) on 5 December 2010.[19] More recently, during a subsequent test on 10 January 2011, a CRH380BL set reached a new record speed of 487.3 km/h (302.8 mph), breaking the previous record held by the CRH380A.[20]

Since 13 January 2011, the CRH380BL enter regular service at the Shanghai–Hangzhou High-Speed Railway and Shanghai–Nanjing High-Speed Railway.[21]

All 54 CRH380BL trainsets were recalled in mid-August 2011 due to operational problems on the new Beijing–Shanghai High-Speed Railway. The new trains were reported as being "too sensitive" and the subject of frequent breakdowns in stormy weather. They will be temporarily replaced by the CRH380A and CRH380AL.

As of December 2011, the recalled trainsets have returned to service.

CRH380CL

CRH380CL

Changchun Railway Vehicle released a redesigned nose fitted onto a CRH380B body at the Modern Railways 2010 on 6 December 2010. The new design will be designated the CRH380CL, with the Bombardier Zefiro redesignated the CRH380D, and will incorporate electrical equipment from Hitachi. 25 16-car trainsets have been ordered by the MOR, replacing 25 previously ordered CRH380BL units.[22] The first trainset was delivered underwent testing starting in 2011.[23] The trains entered regular service in the Spring of 2013.[24]

Formation

Power Destination

Coach Type

CRH3C

Coach No. 12345678
Type ZE ZEC ZY ZE
Power Configuration MC TP M T M TP MC
Power Units Unit 1 Unit 2
Capacity 60+8 80 80 50 50 80 80 60+8

CRH380B

Coach No. 12345678
Type ZYS ZE ZEC ZE ZES
Power Configuration MC TP M T M TP MC
Power Units Unit 1 Unit 2
Capacity 28+5 85 85 75 63 85 85 40+5

CRH380BG

Coach No. 12345678
Type ZYT ZE ZEC ZE ZET
Power Configuration MC TP M T M TP MC
Power Units Unit 1 Unit 2
Capacity 1 44+8 80 80 71 40 80 80 60+8
Capacity 2 (EC Type) 28+5 85 85 75 63 85 85 40+5

CRH380BL

Coach No. 12345678910111213141516
Type 1 ZYG ZY SW ZY ZE CA ZE ZYG
Type 2 SW ZY ZE CA ZE SW
Power Configuration MC TP M T M TP M TP M T M TP MC
Power Units Unit 1 Unit 2 Unit 3 Unit 4
Capacity1 2+37 56 24 56 71 80 80 80 80 80 80 80 80 80 2+37
Capacity2 3+13 56 56 80 71 80 80 80 80 80 80 80 80 80 3+13

CRH380CL

Coach No. 12345678910111213141516
Type 1 ZYG ZY SW ZY ZE CA ZE ZYG
Type 2 ZYS ZY ZE CA ZE ZYS
Power Configuration MC TP M T M TP M TP M T M TP MC
Power Units Unit 1 Unit 2 Unit 3 Unit 4
Capacity1 2+37 56 24 56 71 80 80 80 80 80 80 80 80 80 2+37
Capacity2 3+13 56 56 80 71 80 80 80 80 80 80 80 80 80 3+13

Train series number

CRH3C made by Siemens: CRH3C-3002 ~ CRH3C-3004.

CRH3C made by CNR Tangshan Railway Vehicles:CRH3C-3001, CRH3C-3005 ~ CRH3C-3080.

CRH380B made by CNR Changchun Railway Vehicles: CRH380B-5637 ~ CRH380B-5681.

CRH380B made by CNR Tangshan Railway Vehicles: CRH380B-3571 ~ CRH380B-3700.

CRH380BG made by CNR Changchun Railway Vehicles: CRH380BG-5546 ~ CRH380BG-5585.

CRH380BG (EC Type) made by CNR Changchun Railway Vehicles: CRH380BG-5586 ~ CRH380BG-5600, CRH380BG-5626 ~ CRH380BG-5636 and CRH380BG-5682 ~ CRH380BG-5772.

CRH380BL made by CNR Changchun Railway Vehicles: CRH380BL-5501 ~ CRH380BL-5545.

CRH380BL made by CNR Tangshan Railway Vehicles: CRH380BL-3501 ~ CRH380BL-3570.

CRH380CL made by CNR Changchun Railway Vehicles: CRH380CL-5601 ~ CRH380CL-5625.

Distribution

As of June 2015

Operator Quantity Series number Lines serving Note
CRH3C
Beijing Railway Bureau20CRH3C-3001 ~ CRH3C-3016、
CRH3C-3018 ~ CRH3C-3021
Jingjin ICL
Guangzhou Railway Group Co.,Ltd60CRH3C-3017、CRH3C-3022 ~ CRH3C-3080Jingguangshengang High-Speed RailwayGuangzhou–Shenzhen–Hong Kong Express Rail LinkHangzhou–Fuzhou–Shenzhen High-Speed RailwayLiu Heng RailwayGuiyang–Guangzhou High-Speed RailwayHang Long Passenger LineLong-Kunming passenger line
CRH380B
Shenyang Railway Bureau5CRH380B-6246~CRH380B-6250 Harbin–Dalian High-Speed Railway
Harbin Railway Bureau35CRH380B-6251~CRH380B-6285 Harbin–Dalian High-Speed Railway
CRH380BL
Shanghai Railway Bureau29CRH380B-6225L~CRH380B-6230L, CRH380B-6401L~CRH380B-6423LHuning PDLHuhang PDL
Beijing Railway Bureau11CRH380B-6202L, CRH380B-6206L~CRH380B-6207L, CRH380B-6210L, CRH380B-6211L, CRH380B-6215L~CRH380B-6218L, CRH380B-6222L~CRH380B-6224LBeijing–Shanghai High-Speed Railway Harbin–Dalian High-Speed Railway
Shenyang Railway Bureau5CRH380B-6301L~CRH380B-6305L

Harbin–Dalian High-Speed Railway Beijing–Shanghai High-Speed Railway

Harbin Railway Bureau35CRH380B-6501L~CRH380B-6535L

Harbin–Dalian High-Speed Railway

Jinan Railway Bureau26CRH380B-6201L, CRH380B-6203L~CRH380B-6205L, CRH380B-6208L~CRH380B-6209L, CRH380B-6212L~CRH380B-6214L, CRH380B-6219L~CRH380B-6221L, CRH380B-6245LBeijing–Shanghai High-Speed Railway
Guangzhou Railway Bureau29CRH380B-6429L~CRH380B-6457LWuhan–Guangzhou High-Speed Railway
CRH380CL
Beijing Railway Bureau8CRH380CL-5601、 CRH380CL-5603、
CRH380CL-5605 ~ CRH380CL-5608、 CRH380CL-5620、 CRH380CL-5621
Beijing–Shanghai High-Speed RailwayQingdao–Jinan High-Speed Railway, Harbin–Dalian High-Speed Railway
Shanghai Railway Bureau9CRH380CL-5602、 CRH380CL-5604、
CRH380CL-5611 ~ CRH380CL-5613、 CRH380CL-5615、 CRH380CL-5619、
CRH380CL-5623、 CRH380CL-5624
Ninghang Intercity RaiwayHuhang PDLHang-Yong PDLHuning PDLQingdao–Jinan High-Speed Railway
Jinan Railway Bureau8CRH380CL-5609、 CRH380CL-5610、 CRH380CL-5614、
CRH380CL-5616 ~ CRH380CL-5618、 CRH380CL-5622、 CRH380CL-5625
Jinghu High-Speed RailwayNinghang Intercity RaiwayHuhang PDLHang-Yong PDLQingdao–Jinan High-Speed Railway

See also

References

  1. 1 2 3 4 5 6 7 8 https://web.archive.org/web/20130704164527/http://www.eng.ku.ac.th/blog/wp-content/uploads/rolling/16/CNR%20After.pdf
  2. 1 2 "China's first 300 km/h trainsets are taking shape". Railway Gazette International. 2007-08-01. Retrieved 2010-05-29.
  3. 1 2 3 4 5 "Hochgeschwindigkeits-Triebzug Velaro CN, China" (in German). Siemens AG. Retrieved 2010-05-29.
  4. http://en.chinacnr.com/394-971-10596.aspx
  5. "Erneuter Erfolg für die Hochgeschwindigkeitszüge von Siemens Siemens liefert mit chinesischen Partnern weitere 100 Züge für China" (in German). pressrelations.de. 2009-03-20. Retrieved 2010-05-29.
  6. "Siemens Transportation Systems Group opens its high-speed train project office in Tangshan". Siemens AG. 2006-07-27. Archived from the original on 16 June 2009. Retrieved 2008-06-30.
  7. "China's first high speed train ready for shipment". Siemens AG. 2007-12-29. Retrieved 2008-06-30.
  8. http://www.railwaygazette.com/news/single-view/view/cnr-tangshan-rolls-out-crh3a.html
  9. 1 2 "Tangshan rolls out its first 350 km/h train". Railway Gazette International. 2008-04-11. Retrieved 2008-06-30.
  10. "Products:EMU". www.tangche.com (in Chinese).
  11. "Velaro sets Chinese speed record". Railway Gazette International. 2008-06-27. Retrieved 2010-05-29.
  12. "铁道部部长在高速列车上的"记者招待会". www.china-mor.gov.cn. 2009-12-09. Retrieved 2009-12-09.
  13. 招商证券-中国北车-601299-动车组第三批高毛利率订单将陆续交付. www.docin.com (in Chinese).
  14. "Meet The Train Makers, Part 6: China". www.infrastructurist.com. 20 November 2009.
  15. 长客签下235亿订单. jlrbszb.chinajilin.com.cn (in Chinese). 28 September 2009.
  16. "The World Railway Development and Research Society annual meeting 2009 was held in Beijing" (in Chinese). worldtrailway.cn. 2009-12-09. Retrieved 2010-05-29.
  17. "时速超400公里的是CRH2型的380级别的动车吗-城际高铁-地铁族". Ditiezu.com. Retrieved 2013-04-06.
  18. "下线仪式CRH380B-6401L rolled off production line". YouTube. 2010-09-24. Retrieved 2013-04-06.
  19. "千龙网-北京-时速500公里试验列车正在研制(图)". Beijing.qianlong.com. 2010-12-07. Retrieved 2013-04-06.
  20. "中国北车刷新高铁运营试验世界纪录速度(图)-搜狐证券". Stock.sohu.com. Retrieved 2013-04-06.
  21. "1月13日起"飞毛腿"动车将在宁杭间开跑_新闻中心_新浪网". News.sina.com.cn. Retrieved 2013-04-06.
  22. http://attachment.ourail.com:9999/hgfd4g634v4v/day_101217/101217115492aeec2493fd5a15.jpg
  23. "CRH380CL, China High Speed train中國高鐵". YouTube. 2011-05-24. Retrieved 2013-04-06.
  24. https://www.youtube.com/watch?v=lEUOiKm3HoU
Wikimedia Commons has media related to China Railways CRH3.
This article is issued from Wikipedia - version of the 11/25/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.