Chennai HSCTC

Chennai High Speed Circular Transportation Corridors
Route information
Length: 107.795 km (66.981 mi)
Existed: 2009 – present
History: First corridor: Chennai Port - Maduravoyal Corridor; scheduled for completion in 2013
Location
Major cities: Chennai
Highway system

Chennai High Speed Circular Transportation Corridors (HSCTC) is an urban road transit in the form of elevated concentric beltways planned for the city of Chennai. The beltways are envisaged as an elevated 2-tier system with design speed of 80 km/h. The top tier is a 2-lane dedicated corridor for the Chennai BRTS system. The second tier is a 4-lane road for 4-wheelers (no buses and autos).[1]

Beltways

4 beltways have been proposed which covers a distance of 107.795 km. A connectivity corridor is also proposed to integrate the beltways with the ECR elevated expressway.

Beltway 1

Beltway 1 is the outermost beltway encompassing an area of 167 km2. It is formed by the following corridors.

Beltway 2

This beltway encompasses an area of 52 km2. It is formed by the following corridors.

Beltway 3

This beltway encompasses an area of 30 km2. It is formed by the following corridors.

Beltway 4

The beltway 4 is formed by the following corridors.

Integrating beltways with elevated expressways

  1. Already under construction by NHAI

Corridor Details

These 4 beltways can be broken down into 9 corridors.

Name Type Along/Across From To via Length (km) Cost in INR crores (Estimated) Status Developed by Completion
Adyar Corridor Elevated 2-tier Corridor Southern Banks of Adyar River Thiru-vi-ka Bridge Porur Nandambakkam 15.845 1430 Proposed Adyar Poonga Trust 2013 (estimated)
Port-Maduravoyal Corridor Elevated Corridor Banks of Cooum River Chennai Port Maduravoyal 19 1655[2]/2090[3] Under Construction[4][5] NHAI 2012
Chennai Bypass Corridor Fully access-controlled at grade 4-lane corridor with 2-lane elevated BRTS corridor along the median Tambaram Manali Maduravoyal 32 Complete NHAI 2010
North Buckingham Canal Corridor Elevated Corridor Western Bank of Buckingham Canal, Wall Tax Road, Poonamallee High Road, Flag Staff Road Manali Oil Refinery Road (MORR) War Memorial Chennai Central 12.3 740 Proposed Adyar Poonga Trust
Central Buckingham Canal Corridor Elevated Corridor Western Bank of Buckingham Canal Swami Sivananda Salai Radhakrishnan Salai 2.860 170 Proposed Adyar Poonga Trust
Connectivity Corridor Elevated Corridor ECR Elevated Expressway, Santhome bypass road, Santhome High Road, Greenways Road Radhakrishnan Salai Thiru-vi-ka Bridge Foreshore Estate 5.140 350 Proposed Adyar Poonga Trust
Mambalam Canal Corridor Elevated Corridor Mambalam Canal Adyar Corridor G.N. Chetty Road Anna Salai, South Usman Road, Venkatnarayana Road, Theyagaraya Road 5.000 195 Proposed Adyar Poonga Trust
Inner Ring Road Corridor At-grade 8-lane Corridor Inner Ring Road Jafferkhan Bridge Koyambedu Ashok Nagar 5.95 25 At-grade corridor coz of elevated corridor 2 of Chennai Metro that is under construction along the same alignment. Adyar Poonga Trust
East Coast Elevated Expressway Elevated Corridor East Coast Light House ECR Besant Nagar 9.7 430* (1st Phase) Proposed[6] Tamil Nadu State Highways 2013 (estimated)
Entire HSCTC 107.795 5400#
* Revised cost during tender process
# Excluding cost of Chennai Bypass Corridor

Chennai Port - Maduravoyal Corridor [19 km]

This 19 km corridor is implemented under Phase-VII [7] of National Highways Development Project by NHAI. The pre-construction work has already begun.

Chennai Bypass Corridor [32 km]

Main article: Chennai Bypass

The Chennai bypass Corridor is a 32 km fully access controlled at-grade corridor. A 2-lane elevated BRTS corridor is proposed along the median of the Phase II of this expressway. The corridor is under construction.

Adyar Corridor [15.845 km]

Section I

Section II

North Buckingham Canal Corridor [12.3 km]

Section I

Section II

Section III

Section IV

Central Buckingham Canal Corridor [2.860 km]

Inner Ring Road Corridor [5.9 km]

Mambalam Canal Corridor [5 km]

Connectivity Corridor [5.140 km]

East Coast Elevated Expressway [9.7 km]

This is 9.7 km elevated expressway along the east coast of Bay of Bengal from Light House, Chennai to East Coast Road via Besant Nagar.

Interchanges

A total of 15 interchanges has been proposed along the HSCTC alignment of which 3 are already under construction by NHAI. A 3-tier interchange at Irumbuliyur is already functional.

Adyar Corridor Interchanges (6)

Chennai Bypass Corridor Interchanges (2)

Chennai Port - Madhuravoyal Elevated Expressway Interchanges (2)

North Buckingham Canal Corridor Interchanges (2)

Mambalam Canal Corridor Interchanges (1)

East Coast Elevated Expressway Interchanges (2)

Project Status

2008

January:

November:

2009

28 May:

31 May:

3 June:

16 June:

12 August:

26 August:

2010

July 2010:

See also

References

  1. Tamil Nadu Urban Development Fund. Tnudf.com (2006-10-06). Retrieved on 2013-12-06.
  2. Chennai Port-Maduravoyal Four Lane Elevated Road Project by National Highways Authority Of India. Processregister.com. Retrieved on 2013-12-06.
  3. Tamil Nadu / Chennai News : Elevated expressway work to begin in November. The Hindu (2009-06-18). Retrieved on 2013-12-06.
  4. Archived 6 June 2011 at the Wayback Machine.
  5. Tamil Nadu / Chennai News : Elevated expressway to have toll plazas. The Hindu (2009-01-28). Retrieved on 2013-12-06.
  6. Front Page : Work on elevated road along the coast will begin shortly. The Hindu (2009-01-25). Retrieved on 2013-12-06.
  7. .Completed Stretches on Golden Quadrilateral Archived 27 August 2009 at the Wayback Machine.. NHAI (2013-10-31). Retrieved on 2013-12-06.
  8. Archived 3 March 2009 at the Wayback Machine.
  9. Tamil Nadu / Chennai News : Consultant appointed for BRTS corridors. The Hindu (2008-11-02). Retrieved on 2013-12-06.
  10. Tamil Nadu / Chennai News : Alignment for elevated bus corridors notified. The Hindu (2009-05-31). Retrieved on 2013-12-06.
  11. Tamil Nadu / Chennai News : Residents oppose elevated road project. The Hindu (2009-06-03). Retrieved on 2013-12-06.
  12. Adyar Poonga Trust promises to resettle families displaced by circular corridor - Times Of India. Articles.timesofindia.indiatimes.com (2009-06-03). Retrieved on 2013-12-06.
  13. Tamil Nadu / Chennai News : Proposed elevated roads in Chennai a boon or bane?. The Hindu (2009-06-16). Retrieved on 2013-12-06.
  14. Chennai circular corridor shortened to accommodate metro railway - Economic Times. Economictimes.indiatimes.com (2009-08-12). Retrieved on 2013-12-06.
  15. Tamil Nadu / Chennai News : Study likely to be over by January. The Hindu (2009-08-26). Retrieved on 2013-12-06.
  16. Nod for expressway. The Hindu (2010-07-26). Retrieved on 2013-12-06.
This article is issued from Wikipedia - version of the 11/21/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.