Gründjitobel Viaduct

Gründjitobel Viaduct
Gründjitobel-Viadukt

Gründjitobel Viaduct

Gründjitobel Viaduct in winter
Coordinates 46°49′29″N 09°41′30″E / 46.82472°N 9.69167°E / 46.82472; 9.69167Coordinates: 46°49′29″N 09°41′30″E / 46.82472°N 9.69167°E / 46.82472; 9.69167
Carries Rhaetian Railway
Crosses Gründjitobelbach
Locale Langwies, Switzerland
Official name Gründjitobel-Viadukt
Owner Rhaetian Railway
Maintained by Rhaetian Railway
Characteristics
Design Arch
Material Reinforced concrete
Total length 145 m (476 ft)
Height 46 m (151 ft)
Longest span 86 m (282 ft)
History
Designer Jakob Bolliger
Constructed by Müller, Zeerleder und Gobat
Construction begin June 1913
Construction end July 1914
Opened December 1914

The Gründjitobel Viaduct (or Gründjitobel Bridge; German: Gründjitobel-Viadukt) is a single track reinforced concrete railway bridge, spanning the Gründjitobelbach near Langwies, in the Canton of Graubünden, Switzerland.

Designed by Hermann Schürch, it was built between late June 1913 and early July 1914 by Müller, Zeerleder und Gobat, for the Chur–Arosa railway. It is now owned and used by the Rhaetian Railway.

Location

The viaduct is located on the Rhaetian Railway's metre gauge line from Chur to the holiday and recreation resort of Arosa (the Chur-Arosa line), between Peist and Langwies, at a place known as Matten-Gründji. It leads the railway line over the Gründjitobel, a steeply eroded gravel moraine gorge, with sandy formations known as "Steimannli".

History

Due to the difficult geological conditions in Schanfigg, a total of 18 tunnels and 40 bridges needed to be created between 1912 and 1914 for the privately built Chur-Arosa line. Most of the bridges were constructed in the classical manner, in stone, which was often available in sufficient quantities in the nearby Plessur River valley. In places where the building conditions were especially unpromising, iron bridges were created.

A completely new building method came to be used near Gründji, due to the distance to be overcome by the Gründjitobel Viaduct, and also by the Langwieser Viaduct, located only a short distance to the southeast. At each of these points, instead of a bridge with many multiple openings, a sensational reinforced concrete structure arose with a large single span. The risk that piers might be undermined by the course of the river could thus be met successfully; since the completion of the Chur-Arosa line, the Gründjitobel Viaduct has only rarely been harmed by erosion.

Technical data

The Gründjitobel Viaduct is 145 metres (476 ft) long. The main span consists of an arch with an 85 metres (279 ft) long span, and a rise of 45 metres (148 ft) above the valley floor.

The whole build of the structure proceeded virtually trouble free, and could be completed in just one year. Together with the larger Langwieser Viaduct, which can be considered its prototype, the Gründjitobel Viaduct was, as at the date of its completion, one of the longest spanning railway bridges in the world.

The falsework, which had already been used in the construction of the Halen Bridge in Kirchlindach, Bern, originated, as with the Langwieser Viaduct, from Richard Coray of Trin. The structure was built by the firm Müller, Zeerleder und Gobat.

See also

References

    Wikimedia Commons has media related to Gründjitobel Viaduct.
    This article is issued from Wikipedia - version of the 10/24/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.