Hanover–Berlin high-speed railway

Hanover–Berlin high-speed railway
Overview
Native name Schnellfahrstrecke Hannover–Berlin
Locale Lower Saxony, Saxony-Anhalt, Brandenburg, and Berlin, Germany
Line number 1730 (Hannover–Lehrte)
6107 (Lehrte–Oebisfelde)
6185 (Oebisfelde–Berlin-Spandau)
6109 (Berlin-Spandau–Berlin Ostbf)
Operation
Opened 15 September 1998
Technical
Line length 258 km (160 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 15 kV/16.7 Hz AC
Overhead catenary
Operating speed 250 km/h (160 mph) (maximum)
Route number 301, 349
Route map

Legend
0.0 Hannover Hbf
16.1
239.3
Lehrte
Fallersleben junction
Weddel loop from Brunswick
180.9 Wolfsburg Hbf
~178 Beginning of 250 km/h operations
167.3
267.9
Oebisfelde
216.8 Beginning of Stendal southern bypass
(105.1) Stendal
198.8 End of Stendal southern bypass
Elbe bridge, Hämerten (810 m)
Havel (230 m)
170.9 Rathenow
166.0 Beginning of great bustard protection zone
165.6 Bamme junction main line
148.5 Ribbeck junction main line
148.0 End of great bustard protection zone
(18.5) Berlin-Staaken
118.0 End of 250 km/h operations
From Hamburg
112.7
18.3
Berlin-Spandau
To Hbf (low level)
(see Berlin Stadtbahn)
9.0 Berlin Zoologischer Garten
5.4 Berlin Hbf (high level), North–South mainline
0.0 Berlin Ostbf
Source: German railway atlas[1]

The Hanover–Berlin high-speed railway is a 258 kilometre railway line linking the German cities of Hanover and Berlin

The Wolfsburg-Berlin section was built as a new line and runs largely parallel to the Lehrter Bahn (the old Berlin-Hanover railway) opened in 1871. The whole line was opened officially on 15 September 1998 and has been in commercial service since 20 September 1998.

The overall Hanover-Berlin project (including the reorganization and upgrading of the Lehrter Bahn) was carried out as German unity rail project no 4 of the federal transport plan.

Project

The line consists of five sections: upgraded line between Hanover and Lehrte (for operations up to 160 km/h) and between Lehrte and Wolfsburg (200 km/h), the new and upgraded line between Wolfsburg and Oebisfelde (68 km altogether); the 148 km-long new line between Oebisfelde and Staaken (250 km/h) and the connection between Staaken and the Berlin Stadtbahn and Berlin station (60 to 160 km/h).

Due to its flat profile the line has few structures, apart from a cut-and-cover tunnel under the Elbe-Seitenkanal (c. 1975) and four large bridges over the Mittelland Canal, the Elbe, the Havel and the Havel Canal. The line was the first German line which was mostly constructed with slab (ballast-less) track.

Stations

Planning

In the 1980s planning began on an improved line for ICE trains for transit traffic (people who were allowed to transit, but did not have a visa to visit East Germany) between West Germany and West Berlin. In September 1988, the governments of West Germany and East Germany began negotiations in relation to the development of the Lehrterbahn for speeds up to 200 km/h.[2]

Options available were:

In 1990 the northern route was chosen; it was the shortest and fastest connection between Berlin and Hanover and was used by the long-distance high-speed trains before World War II. The option that was favored had the transit tracks parallel with, but separately from, the existing tracks of the Lehrterbahn, which would remain available for internal East German traffic. The existing line would be used from Wolfsburg to Hanover as an upgraded line. The new and upgraded line was intended for passenger traffic and the original line for goods traffic. At several points the new and original lines were to be interconnected, including Rathenow and Stendal.

On 28 June 1990 the transport ministers of the two still separate Germans States, Horst Gibtner and Friedrich Zimmermann signed an agreement to build a high-speed line along the existing Lehrtebahn, following two years of negotiations.[3]

It was originally planned that the high-speed line would be used by an hourly IC/ICE line between Hanover and/or Braunschweig and Berlin. As a result of the expected increase of traffic due to German reunification four lines had been adopted by 1991:

Taking into regional, suburban and freight trains, planning was based on 200 trains each day (in both directions) between Berlin and Stendal for the high-speed and original routes. In consequence, it was decided that the design speed for the high-speed line would be 250 km/h, the original line would be developed for a design speed of 160 instead of 120 km/h and earthworks and structures on the largely single-track original route between Staaken and Stendal would make provision for a second track.[3]

Construction

Separation of the high speed line (right) from the Berlin-Hamburg line near Spandau

Building began on 11 November 1992 with the beginning of work on the 812 m-long Elbe bridge at Hämerten. Parallel to the building of the new line, Lehrterbahn was reorganised. At the same time construction commenced at Berlin Spandau long-distance station and on the Weddel loop line, a 21 km-long connection between Fallersleben (near Wolfsburg) and Weddel (near Braunschweig).

The 16.7 hz traction current line between Oebisfelde and Rathenow, which was brought into service on 14 March 1995, was the first traction current connection established between west and east Germany. The last viaduct was finished in October 1997 with the bridge over the Havel Canal.

During the building phase, archaeologists carried out approximately 4,000 digs in Brandenburg and made discoveries in 30 places, including finds of some objects that were over 1,500 years old.

Numerous test and acceptance runs were made with ICE S trains at up to 331 km/h between April and August 1998. Services commenced on 24 May 1998 on the Vorsfelde-Stendal section. On 15 September 1998 the whole line was officially opened.

In 2005 long-planned changes began on the eastern side of Lehrte station. On 15 January 2007 two new bridges were opened as a flying junction in Lehrte, overcoming congestion at the junction. When work on points is completed in 2008, the running speed of the main line will be raised from 60 to 120 km/h. The Federal government plans to invest 376 million for upgrades between Hanover and Lehrte between 2006 and 2010.[4]

Great bustard protection area

East of Rathenow, near Buckow, the line runs by the 6,400 ha nature reserve of Havelländisches Luch. It is one of the last refuges in Germany for the vulnerable great bustard, one of the heaviest flying birds of the world.

There were extensive discussions until 1995 in relation to measures to protect the birds, including consideration of the building of a six-km long tunnel for approximately DM one billion. In order not to disturb the birds, this would have required about seven years to build. A cut-and-cover tunnel would have cost DM 500 million. A deviation around the entire area was also examined.

In order to protect the endangered species, for a length of six km (between the 153 and 158 km marks) seven metre-high embankments were built to assist the over-flight of the birds, which have quite slow and low take-offs. The cost for this work was DM 35 million. On a 17 km-long section (between the 148.5 and the 165.5 km marks) the third track of the parallel Lehrterbahn was omitted and trains from it run on the new line. In addition on this section, the overall height of the electrification supply lines is reduced and the maximum speed is reduced to 200 km/h. An area of approximately 300 hectares was added to the nature park as compensatory habitat. This work delayed the planned opening from 1997 to 1998.

Commencement of operations

On 24 May 1998 the Wolfsburg-Oebisfelde-Stendal section of the new line entered service. The whole new line was officially opened on 15 September 1998 by the Chancellor Helmut Kohl, DB boss Johannes Ludewig and Berlin Mayor Eberhard Diepgen. In Berlin Ostbahnhof the opening ICE was officially named the “Claus Graf Stauffenberg”, before it ran to Hanover via Stendal and Wolfsburg as ICE18952.

With the timetable change on 20 September 1998 the travel time between Berlin and Hanover was reduced from four hours and twelve minutes (1990) to one and a half hours; the Berlin-Frankfurt time was reduced to an even four hours. The drastic travel time reduction on the new line led to rising passenger numbers, as a result of the cancellation of the competing air services between Berlin and Hanover.

With the opening of the high-speed line, the two state capitals of Magdeburg and Potsdam lost their ICE connections. As a consequence there were violent protests, which led for some time to the reinstatement of occasional ICEs between Berlin and Wolfsburg on the old line.

Service

Several ICE/IClines run across the line:

Running speeds

The new line is regularly operated between the 178 km-mark of the Lehrterbahn (near Vorsfelde) and the 118 km-mark (near Berlin-Staaken) at 250 km/h; in the great bustard protection area (148 to 166 km-marks) the maximum speed is 200 km/h. The upgraded line in the Lehrte–Wolfsburg–Oebisfelde section is designed for 200 km/h.

On 13 August 2001 an ICE S ran on the new line at 393 km/h. This is the second highest speed that has been achieved so far on German railways.

In 2011 the part from Ribbeck to Wustermark was upgraded for 300 km/h and use of the eddy current brake during regular operation.

See also

Notes

  1. Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. Jahresrückblick 1988 − Neu- und Ausbaustrecken. In Die Bundesbahn 1/1989, S. 58 (German)
  3. 1 2 Helmut Weber, Gernot Arnhold: Schnellverbindung Hannover–Berlin: Abschnitt Oebisfelde–Staaken ein Jahr nach Planungsstart. In Die Bundesbahn 10/1991, p 977 ff. (German)
  4. Bundesministerium für Verkehr, Bau und Stadtentwicklung: Investitionsrahmenplan bis 2010 für die Verkehrsinfrastruktur des Bundes, April 2007 (German)

References

Wikimedia Commons has media related to Hanover–Berlin high-speed railway.
This article is issued from Wikipedia - version of the 6/25/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.