The Sakhalin Tunnel (Russian: Сахалинский тоннель) is an incomplete and currently postponed construction project, which after completion would connect the island of Sakhalin with mainland Russia via a tunnel of approximately 10 kilometers (6.2 mi) under the Nevelskoy Strait (the narrowest part of the Strait of Tartary). On January 16, 2009, it was suggested by the Russian government the link could be completed with a bridge, rather than tunnel.[1]
History
Early proposals and planning
The concept of a tunnel under the Nevelskoy Strait has existed since the 19th century, although it was never seriously pursued due to economic reasons. Studies into the feasibility of the project were first undertaken by the Soviet Union in the late 1930s, although World War II made progress at this time impossible. Joseph Stalin later announced in 1950 his intention to build a railway link to Sakhalin, either via rail ferry, a causeway, or a tunnel. A decision to construct a tunnel was announced by the Soviet government on May 5, 1950, along with a rail ferry link to serve as a temporary solution. The project was intended primarily to serve a military purpose, allowing better connection between Sakhalin and the mainland for sections of the Red Army stationed on the island.
Construction
Selikhino-Sakhalin railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend
|
The construction of the railway connection from Selikhino near Komsomolsk-on-Amur to the intended mainland tunnel portal at Cape Lazarev was assigned to the Soviet Ministry of Internal Affairs, with the Ministry of Transport in charge of the tunnel itself. In 1952, the project was transferred to the full management of the Ministry of Internal Affairs.
The planned route on Sakhalin was intended to run 327 kilometers (203 mi) from Cape Pogibi, where the tunnel should resurface, to the then northern terminus of the Sakhalin rail network at Pobedino (formerly known as "Koton" under Japanese rule), 10 kilometers (6.2 mi) north of Smirnykh. The length of the tunnel between Cape Pogibi and Cape Lasarev was planned to be around 10 kilometers (6.2 mi). On the mainland, a rail line was to be constructed to the railway connecting Komsomolsk-on-Amur with Sovetskaya Gavan, now a section of the Baikal-Amur Mainline.
The project was planned for completion by the end of 1953 and to be in full operation by the end of 1955. Annual goods traffic on the line was projected to reach four million tonnes.
The project included three separate constructions—mainland and island railway links, connecting with the rest of railroad network (Building 507 and 506 respectively) and tunnel itself (Building 6 of MPS). Railway characteristics were very poor; in fact, it was temporary way, which must be followed by capital rebuilding after construction.
Tunnel works (Building 6 of MPS) had another character. It was to be constructed by military engineers and Metrostroy tunnel specialists.
After the death of Stalin, work on the project stopped, with the tunnel allegedly almost halfway across the straits, although later investigation has shown that just two shafts for TBM had been dug. While the reasons for cancellation of the project are not fully clear, some sources have indicated that because of numerous amnesties granted to prisoners after Stalin's death, there was no longer the required workforce. Tunnel workers waited eight months before cancellation, but without linking railways, the tunnel had no purpose.[2]
Completed sections of the project
Around 120 kilometers (75 mi) of track along the right bank of the Amur River from Selikhino to Chyorny Mys was completed, although this was still well short of the planned tunnel entrance at Cape Lazarev. The Selikhino-Chyorny Mys railway was later used for transport of lumber by the Soviet forestry industry, but was closed in the 1990s and the track has been largely dismantled.
Remains of the tunnel entrance are still visible around Cape Lazarev. No new track was built on Sakhalin, although preparatory earthworks on the planned route was used in the construction of a road from Nysh to Pogibi.
Current operations and future prospects
Since 1973, a train ferry has connected Vanino (on the mainland near Sovetskaya Gavan) with the town of Kholmsk on Sakhalin.
Even after the dissolution of the Soviet Union, there have been calls for a revival of the project from politicians, although there have been concerns that the costs of the project would outweigh the benefits.[3] However, there have been recent signs that the link is under serious consideration, including an announcement of support from Russian President Dimitry Medvedev in November 2008.[4] The project is proposed to be completed by 2030.
New plans would see the connection in Sakhalin at Nogliki, which has in the meantime been connected to the island's rail network. Works to convert the island's narrow-gauge rail system, a legacy of the previous Japanese administration of the southern half of the island, to the broader Russian standard gauge.[5]
There have also been proposals to connect the southern tip of Sakhalin to the Japanese island of Hokkaido via a 40-kilometer (25 mi) long bridge or tunnel, thereby allowing a direct land transport link for container traffic from Japan to the Asian mainland and Europe.[6][7]
On January 16, 2009, Vice-Minister of Transport Andrey Nedosekov confirmed that proposals are now under consideration in regards to the Sakhalin-Hokkaido Tunnel. These plans have proposed a bridge rather than a tunnel, with current planning suggesting a tunnel would be 12.4-kilometer (7.7 mi) long, while a bridge would be 6.6-kilometer (4.1 mi) long. An invitation for proposals to Japanese companies by the Russian government has now been issued. His decision to invite Japanese companies to bid to become consortium members of a wide array of Russian rail infrastructure work, particularly the Sakhalin Tunnel (or bridge) to the Russian mainland could be taken as a nod towards future rail cooperation between Russia and Japan.[1]
See also
References
- 1 2 "Sakhalin link proposed". Railway Gazette International. January 16, 2009.
- ↑ http://www.sakhalin.ru/Region/tunnel/build.htm
- ↑ International Railway Journal - Sakhalin rail link too expensive
- ↑ "Russian President wants to connect Sakhalin with the Mainland" (in Russian). Prima Media. November 19, 2008.
- ↑ "Railway a Gauge of Sakhalin's Future". The Moscow Times. July 7, 2008.
- ↑ "Plan for Tunnel to Sakhalin Unveiled". St. Petersburg Times. November 28, 2000.
- ↑ "Sakhalin-Hokkaido Tunnel Project Discussed in Sakhalin". Interfax. September 29, 2005.