Park Street (MBTA station)

Not to be confused with Park Street railway station.
PARK STREET
PARK STREET

Northbound (right) and center platforms for the Red Line
Location Tremont and Park Streets
Boston, MA 02108
Coordinates 42°21′23″N 71°3′45″W / 42.35639°N 71.06250°W / 42.35639; -71.06250 (Park Street MBTA Station)Coordinates: 42°21′23″N 71°3′45″W / 42.35639°N 71.06250°W / 42.35639; -71.06250 (Park Street MBTA Station)
Owned by MBTA
Line(s)
  Green Line (all branches)
Platforms 2 island platforms, 1 side platform (upper level, Green Line)
1 island platform, 2 side platforms (lower level, Red Line)
Tracks 4 (upper level - Green Line)
2 (lower level - Red Line)
Connections

MBTA Bus: 43, 55
via Winter Street Concourse to Downtown Crossing:

Construction
Platform levels 2
Disabled access Yes
History
Opened September 3, 1897 (upper level)
March 23, 1912 (lower level)
Rebuilt 1915, 1936, 1977-79, 1980s, 2004, 2012
Traffic
Passengers (2013) 19,653 (weekday average boardings)[1]
Services
Preceding station   MBTA   Following station
Green LineTerminus
Green Line
toward Riverside
Green Line
Terminus
toward Heath Street
Green Line
toward Lechmere
toward Alewife
Red Line
toward Ashmont or Braintree
  Connecting lines
(Transfer at Downtown Crossing)
 
toward Forest Hills
Orange Line
toward Oak Grove
Silver LineTerminus
One-way operation
  Former services  
Boston Elevated Railway
toward Dudley
Main Line Elevated
1901-1908
Location

Park Street is a station on the MBTA subway system, located at the intersection of Park Street and Tremont Street under Boston Common in downtown Boston. One of the two oldest stations on the "T" (the other is Boylston), Park Street is the transfer point between the Green and Red Lines, as one of the quartet of "hub stations" on the MBTA subway system. Park Street is the fourth-busiest station in the MBTA network, with an average of 19,836 entries each weekday in 2010.[1]

History

Initial construction

Tremont Street Subway

Plan of the Tremont Street Subway (Green Line) level of Park Street in 1898; the station has since been substantially modified.

The southern section of the Tremont Street Subway from the Public Garden Incline through Boylston to Park Street opened on September 1, 1897, followed on October 1 by the spur to the Pleasant Street Portal.[2] The station was built with 4 tracks serving 2 island platforms; these were connected by two loops, allowing streetcars from the south and west to reverse direction and return to the portals and surface routes.

On September 3, 1898, the tunnel was extended to Scollay Square, Adams Square, Haymarket Square, and the Canal Street Incline.[2] Some cars ran all the way through the tunnel on the outer tracks; others continued to loop at Park Street.

Main Line Elevated

The southbound platform in August 1901, showing the wooden high-level platforms for Elevated trains

On June 10, 1901, the Main Line Elevated began running through the Tremont Street Subway. The platforms at Park Street were retrofitted with raised wooden sections to allow elevated trains to run on the outer tracks to the Pleasant Street Portal while streetcars continued to use the inner tracks and inner loop, entering the subway from the Public Garden Incline.[2] This arrangement lasted until Main Line service was moved to a separate tunnel under parallel Washington Street. Elevated trains last ran through the tunnel on November 28, 1908; they moved to the Washington Street Tunnel on November 30, and streetcar service returned to all track on December 4.[2][3]

Cambridge Tunnel

Cambridge Tunnel platforms at Park Street Under in September 1912
Expansion of the upper level in 1914

On March 23, 1912, the Cambridge Tunnel opened from Harvard Square to Park Street Under.[2] Park Street Under was built with two tracks with one side platform each and a center island platform, intended as a Spanish solution setup to speed boarding. Stairwells were added to the original platform level to connect to the lower level platforms. Unlike most other underground stations on the system (which were cut and cover construction with low ceilings), Park Street Under featured a spacious double-vaulted ceiling.

It was the first transfer station on the system to receive the "Under" postfix, rather than a separate name from the existing station. This represented a change in naming policy, and the first step towards easing wayfinding difficulty in the complex system.[4] North Station West (opened later in 1912), South Station Under (1916) and Scollay Under (1916) would later use this naming scheme; only Washington (1915) did not, as the southbound and northbound Main Line platforms there were already separately named Summer and Winter.

Overcrowding had been a problem at Park Street since the Main Line was routed through it, and did not improve when it reverted to streetcar-only operations. The problem worsened with the influx of passengers transferring at Park Street Under, as the only entrances to those platforms were narrow staircases through the streetcar level.[3] In preparation for the extension of the Cambridge Tunnel, the Boston Transit Commission ordered a major renovation. The streetcar platforms were substantially lengthened to the south, and the kiosk on the southbound platform was moved. The construction work began on August 7, 1914, and was completed on March 8, 1915.[3][5]

Construction of the extension begun on May 3, 1912; the Dorchester Tunnel opened to Washington on April 4, 1915, and in three more segments to South Station in 1916, Broadway in 1917, and Andrew Square in 1918.[2]

Later changes

1934 plans of the streetcar level updated to 1948, showing the new northbound side platform and other modifications
The Winter Street Concourse connects to Downtown Crossing station, and was opened in 1979

The stairways to the side platforms on the lower level were widened by 1922 to support increased passenger flow. A new staircase from the northbound streetcar platform to the lower island platform was also installed. These reduced the amount of room available on the north ends of the streetcar platforms, and boarding areas were moved south.[3] The Park Street Information Booth on the upper level, which soon became a Boston landmark, opened on September 15, 1923 and replaced an earlier kiosk in the same location.[5]

In 1936, in response to still-persistent overcrowding, a side platform was built adjacent to the outer northbound streetcar track. A new entrance connected to this platform was built on the east side of Park Street at Temple Place, with a passageway under Tremont Street. A second passage connected the new platform with the Cambridge Tunnel fare lobby opposite Park Street. The new platform moved the streetcar boarding area southbound for the second time. A new lighting system was also installed.[3] The project, funded by the Works Progress Administration, began on January 8, 1936, and was opened on December 5.[5]

In 1964, the outer loop track was removed. Instead, a new crossover was installed allowing southbound streetcars from the through track to reach either side of the southbound platform.[3] There have been proposals to reconnect this loop, to allow trains on the outer inbound track to be turned around at Park Street, but this has not been done because of the cost of structural reinforcements that would now be required. In 1967, as part of a general system rebranding by the newly formed MBTA, the subway lines were assigned colors. The streetcar system—then down to five lines, and soon four—became the Green Line, the Cambridge-Dorchester Line became the Red Line, and the Main Line El became the Orange Line.[2]

The late 1970s saw the first major renovations to the station in four decades. The 1936-built Temple Place entrance and passageway were closed in late 1976, and concession stands were removed in 1977. The modernization included new wall tiles, new lighting, rebuilt staircases, and upgrades to the faregate area on the southbound platform.[3] The Winter Street Concourse, an upper level of the Dorchester Tunnel between Park Street and Downtown Crossing, was cleared of offices and opened as a passenger connector in January 1979. It allows passengers to walk from the northbound Green Line side platform at Park Street to the southbound Orange Line platform at Downtown Crossing while inside fare control.[3][5]

Station layout

Park Street is a bi-level station, with the Green Line running on the upper level and the Red Line on the lower level. It is the only MBTA subway station with six tracks: tracks 1 to 4 are used by Green Line trains, while tracks 5 and 6 are served by the Red Line. The upper level has two island platforms and one side platform, while the lower level has one island platform and two side platforms.

Ground Street Level Exit/Entrance
B1
Green Line
platforms
Mezzanine and Winter Street Concourse to Orange Line and Silver Line platforms
Westbound Green Line toward Cleveland Circle or Heath Street (Boylston)
Island platform, doors will open on the left, right
Westbound Green Line toward Boston College or Riverside (Boylston)
Eastbound Green Line short turn →
Island platform, doors will open on the left, right
Eastbound Green Line toward Government Center, North Station, or Lechmere (Government Center)
Side platform, doors will open on the right
B2
Red Line
platforms
Side platform, doors will open on the right
Northbound Red Line toward Alewife (Charles/MGH)
Island platform, doors will open on the left
Southbound Red Line toward Ashmont or Braintree (Downtown Crossing)
Side platform, doors will open on the right

Accessibility

New elevator opened in December 2012

Park Street station is partially wheelchair accessible, after renovations completed in 2004 and 2012. The Red Line on the lower level has both island and side platforms, a setup that theoretically allows implementation of the "Spanish solution" system of managing heavy passenger traffic flows. However, narrow stairways serving the center island platform impair full implementation of this system, since many impatient riders prefer to sprint up the wider side platform stairway to catch a Green Line transfer. Only the island platform of the Red Line level has elevator access.

New elevators from the surface to the westbound Green Line unpaid lobby and from the westbound Green Line platform to the Red Line island platform opened on December 21, 2012.[6]

The elevators are as follows:

Bus connections

Route 43 bus at Park Street in March 2015

Although Park Street is not a major bus transfer point, it is served by two of the few MBTA Bus routes which run downtown. The 43 Ruggles Station - Park & Tremont Streets via Tremont Street route is a replacement for streetcar service that formerly ran to Park Street through the southern section of the Tremont Street Tunnel, while the 55 Jersey & Queensberry - Copley Square or Park & Tremont Street via Ipswich Street route provides local service to the Back Bay and Fenway-Kenmore areas.

Public art

There are several pieces of public art in the station. Benedictions by Ralph Helmick consists of two giant bronze hands mounted separately over the inbound and outbound Red Line tracks on the lower level of the station.[7] Celebration of the Underground by Lilli Ann K. Rosenberg is a large wall mosaic along the outer outbound (westbound) tracks at the Green Line level, which can be viewed from the outbound island platform. The mosaic commemorates the designation of the Tremont Street Subway, including Park Street station, as a National Historic Landmark.[8]

References

  1. 1 2 "Ridership and Service Statistics" (PDF) (14 ed.). Massachusetts Bay Transportation Authority. 2014. Retrieved 21 May 2014.
  2. 1 2 3 4 5 6 7 Belcher, Jonathan (22 March 2014). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved 28 January 2015.
  3. 1 2 3 4 5 6 7 8 Chasson, George Jr. (1987). Lonto, Arthur J., ed. "Boston's Main Line El: The Formative Years 1879-1908". Headlights. Electric Railroader's Association. 49: 22–23.
  4. O'Regan, Gerry (2012). "MBTA Red Line". nycsubway.org. David Pirmann. Retrieved 27 January 2014.
  5. 1 2 3 4 Clarke, Bradley H. & Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. pp. 43, 49. ISBN 0938315048.
  6. Smith, Kelly (21 December 2012). "New elevators for America's first subway station". Massachusetts Bay Transportation Authority. Retrieved 22 December 2012.
  7. "On the Red Line" (PDF). Massachusetts Bay Transportation Authority. Retrieved 27 January 2015.
  8. "On the Green Line" (PDF). Massachusetts Bay Transportation Authority. Retrieved 27 January 2015.
Wikimedia Commons has media related to Park Street (MBTA station).
This article is issued from Wikipedia - version of the 11/9/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.